GASKET,SW,3IN,150#,PTFE
Material 4100016135 · GASKET · Plant 1000
ASafety-criticalReorderNormalSlow-moving
- Material
- 4100016135
- Category
- GASKET
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 4 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- CAHAYA INDUSTRI SENTOSA PT
- Lead time
- 35 d · P80 51 d
- Unit price
- Rp 91,017
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 13 EA/year: 13 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~35 days; expected demand during lead time 1.3.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 22.
- 5.On hand 2 + on order 0 is at or below the reorder point: order 20 now.
- 6.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
20 EA
Rp 1.8M · order by 01 Oct 2026
Expected arrival ≈ 35 days
Safety-critical (SCE)Convert to Stock ItemSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 7
Rec. Max
22
order qty 14
Service level
100.0%
stockout risk now 13%
Unit price
Rp 91,017
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 378 days ago, 15 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 4 functional locations
2 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1 | 71 | 28.72 |
| PX_HE-611D REFLUX PREHEATER | A | 1 | 0 | 0.22 |
| PX_BF-108-DUCT20 BURNER BF-108 | S | 1 | 1 | 0.45 |
| PX_SDV-1973A COOLING WATER ISOLATION | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 35 ± 16 days (PO history + category, 1 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 09 Jun 2025 | PR06 Regular replenishment | 1 | Rp 91,017 | 25 Jul 2025 | 46 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 07 Sept 2026 | Low | PX_BF-102 | Thermograph wall BF-102 |
| 06 Sept 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
| 03 Sept 2026 | Medium | PX_BF-102 | Replace lamp as per PM finding |
| 30 Aug 2026 | High | PX_BF-102 | Painting BF-102 |
| 27 Aug 2026 | Medium | PX_BF-102 | Decoking follow up BF-102 |
| 14 Aug 2026 | Emergency | PX_BF-102 | Thermograph wall BF-102 |
| 12 Aug 2026 | High | PX_BF-102 | Peep door broken BF-102 |
| 12 Aug 2026 | High | PX_BF-102 | Replace lamp as per PM finding |
| 01 Aug 2026 | High | PX_BF-102 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 18 Sept 2025 | 2 | 201000002100 | Corrective |
| 15 May 2025 | 2 | 201000024896 | Corrective |