Sparely
DU

GASKET,SW,3IN,150#,PTFE

Material 4100016135 · GASKET · Plant 1000

ASafety-criticalReorderNormalSlow-moving
Material
4100016135
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 4 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
CAHAYA INDUSTRI SENTOSA PT
Lead time
35 d · P80 51 d
Unit price
Rp 91,017

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 13 EA/year: 13 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~35 days; expected demand during lead time 1.3.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 22.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 20 now.
  • 6.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
20 EA
Rp 1.8M · order by 01 Oct 2026
Expected arrival ≈ 35 days
Safety-critical (SCE)Convert to Stock ItemSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 7
Rec. Max
22
order qty 14
Service level
100.0%
stockout risk now 13%
Unit price
Rp 91,017
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 378 days ago, 15 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 4 functional locations

2 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A17128.72
PX_HE-611D
REFLUX PREHEATER
A100.22
PX_BF-108-DUCT20
BURNER BF-108
S110.45
PX_SDV-1973A
COOLING WATER ISOLATION
S100.06

Lead time and procurement

Lead time 35 ± 16 days (PO history + category, 1 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
09 Jun 2025PR06
Regular replenishment
1Rp 91,01725 Jul 202546 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
07 Sept 2026LowPX_BF-102Thermograph wall BF-102
06 Sept 2026MediumPX_BF-102Decoking follow up BF-102
03 Sept 2026MediumPX_BF-102Replace lamp as per PM finding
30 Aug 2026HighPX_BF-102Painting BF-102
27 Aug 2026MediumPX_BF-102Decoking follow up BF-102
14 Aug 2026EmergencyPX_BF-102Thermograph wall BF-102
12 Aug 2026HighPX_BF-102Peep door broken BF-102
12 Aug 2026HighPX_BF-102Replace lamp as per PM finding
01 Aug 2026HighPX_BF-102Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
18 Sept 20252201000002100Corrective
15 May 20252201000024896Corrective