GASKET,RING,6IN,300#,GR/304
Material 4100016143 · GASKET · Plant 1000
ASafety-criticalReorderNormalSlow-moving
- Material
- 4100016143
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 5 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 27 d · P80 51 d
- Unit price
- Rp 2.1M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 9.0 EA/year: 9.0 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~27 days; expected demand during lead time 0.7.
- 4.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 15.
- 5.On hand 1 + on order 0 is at or below the reorder point: order 14 now.
- 6.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
- 7.ML early warning: 34% probability of demand in the next 90 days.
Proposed purchase requisition
14 EA
Rp 28.7M · order by 01 Oct 2026
Expected arrival ≈ 27 days
Safety-critical (SCE)ML early warningSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
15
order qty 9
Service level
99.4%
stockout risk now 10%
Unit price
Rp 2.1M
PO history
ML early warning: 34% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 402 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 481.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 5 functional locations
4 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_PP-326A INHIBITOR PUMP | A | 1 | 3 | 1.47 |
| PX_CL-658 RICH AMINE STRIPPER | A | 1 | 1 | 0.38 |
| PX_SDV-1588A INHIBITOR ISOLATION | A | 1 | 0 | 0.06 |
| PY_FCV-448 PP-992B OUTLET FLOW | C | 1 | 0 | 0.11 |
Lead time and procurement
Lead time 27 ± 16 days (PO history + category, 1 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 01 Aug 2026 | PR03 Regular replenishment | 2 | Rp 2.1M | 16 Aug 2026 | 15 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 03 Apr 2026 | Medium | PX_KT-419A | KT-419A steam leak at gland |
| 03 Apr 2026 | Medium | PX_PP-326A | Replace lamp as per PM finding |
| 17 Mar 2026 | Medium | PX_KT-419A | Install cover plate for MCP cracking |
| 08 Dec 2025 | Medium | PX_PP-326A | Repair insulation PP-326A |
| 20 Nov 2025 | Medium | PX_KT-419A | Leak from packing |
| 10 Nov 2025 | Medium | PX_KT-419A | Painting KT-419A |
| 03 Sept 2025 | Medium | PX_KT-419A | Follow up after steam upset KT-419A |
| 12 Aug 2025 | Medium | PX_CL-658 | Install scaffolding at CL-658 |
| 17 Jul 2025 | Medium | PX_PP-326A | PP-326A seal leak |
| 15 May 2025 | Low | PX_KT-419A | PSM25/Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Aug 2025 | 6 | 201000001855 | Corrective |