Sparely
DU

GASKET,RING,6IN,300#,GR/304

Material 4100016143 · GASKET · Plant 1000

ASafety-criticalReorderNormalSlow-moving
Material
4100016143
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
27 d · P80 51 d
Unit price
Rp 2.1M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 9.0 EA/year: 9.0 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~27 days; expected demand during lead time 0.7.
  • 4.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 15.
  • 5.On hand 1 + on order 0 is at or below the reorder point: order 14 now.
  • 6.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
  • 7.ML early warning: 34% probability of demand in the next 90 days.
Proposed purchase requisition
14 EA
Rp 28.7M · order by 01 Oct 2026
Expected arrival ≈ 27 days
Safety-critical (SCE)ML early warningSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
15
order qty 9
Service level
99.4%
stockout risk now 10%
Unit price
Rp 2.1M
PO history
ML early warning: 34% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 402 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 481.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 5 functional locations

4 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_PP-326A
INHIBITOR PUMP
A131.47
PX_CL-658
RICH AMINE STRIPPER
A110.38
PX_SDV-1588A
INHIBITOR ISOLATION
A100.06
PY_FCV-448
PP-992B OUTLET FLOW
C100.11

Lead time and procurement

Lead time 27 ± 16 days (PO history + category, 1 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
01 Aug 2026PR03
Regular replenishment
2Rp 2.1M16 Aug 202615 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
03 Apr 2026MediumPX_PP-326AReplace lamp as per PM finding
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
08 Dec 2025MediumPX_PP-326ARepair insulation PP-326A
20 Nov 2025MediumPX_KT-419ALeak from packing
10 Nov 2025MediumPX_KT-419APainting KT-419A
03 Sept 2025MediumPX_KT-419AFollow up after steam upset KT-419A
12 Aug 2025MediumPX_CL-658Install scaffolding at CL-658
17 Jul 2025MediumPX_PP-326APP-326A seal leak
15 May 2025LowPX_KT-419APSM25/Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
25 Aug 20256201000001855Corrective