Sparely
DU

GASKET,SW,1/4IN,300#,GR/304

Material 4100016156 · GASKET · Plant 1000

AReorderCriticalStockout
Material
4100016156
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 2.5 EA/year: 0.4 unplanned (installed-base failure prior (no history)) + 2.1 from the maintenance plan.
  • 2.Lead time ~31 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 1.7M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
100.0%
stockout risk now 1%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 35.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 2 functional locations

2 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-167
GASOLINE PUMP
A352.33
PX_CL-473
QUENCH OIL SCRUBBER
A100.38

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Mar 2027PX_PP-167Pump overhaul2.15

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Jul 2026MediumPX_PP-167Replace bearing PP-167
04 Mar 2026MediumPX_PP-167Leak from packing
28 Dec 2025MediumPX_PP-167Replace lamp as per PM finding
04 Nov 2025LowPX_PP-167PP-167 abnormal noise
07 Jun 2025MediumPX_PP-167Replace bearing PP-167

Recent goods issues

Never issued in the 17-month history.