GASKET,SHEET,2IN,600#,PTFE
Material 4100016227 · GASKET · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100016227
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 8 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 12 EA/year: 12 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~31 days; expected demand during lead time 1.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 9, order up to 22.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 20 now.
- 5.Installed on 8 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
20 EA
Rp 4.3M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
9
safety stock 8
Rec. Max
22
order qty 13
Service level
100.0%
stockout risk now 29%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 380 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 8 functional locations
4 with criticality A/B · 12 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-856A TURBINE FOR KC-856A | A | 2 | 7 | 2.81 |
| PX_HE-428A RICH AMINE TLE | A | 1 | 0 | 0.22 |
| PX_LCV-1372A PP-1720D LEVEL CONTROL | B | 1 | 4 | 1.83 |
| PX_CL-1699 DEMIN WATER COLUMN | B | 1 | 2 | 1.23 |
| PX_TCV-306 PP-1407B TEMP CONTROL | C | 1 | 0 | 0.12 |
| PX_KT-447 TURBINE FOR KC-447 | S | 4 | 13 | 6.24 |
| PX_KC-210D ETHYLENE BLOWER | S | 1 | 0 | 0.57 |
| PX_KC-486 CONDENSATE AIR COMPRESSOR | S | 1 | 0 | 0.57 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 25 Jul 2026 | Medium | PX_LCV-1372A | [MSI-B-26-YDT-175/M] Replace line |
| 20 Jul 2026 | Low | PX_KT-856A | Follow up after steam upset KT-856A |
| 08 Jul 2026 | Medium | PX_KT-447 | Replace lamp as per PM finding |
| 13 May 2026 | Low | PX_KT-447 | KT-447 trip test |
| 19 Apr 2026 | Low | PX_KT-447 | Follow up after steam upset KT-447 |
| 30 Mar 2026 | Low | PX_KT-447 | Leak from packing |
| 29 Mar 2026 | Medium | PX_LCV-1372A | Overhaul LCV-1372A |
| 28 Mar 2026 | Medium | PX_KT-447 | Follow up after steam upset KT-447 |
| 26 Mar 2026 | Medium | PX_KT-856A | KT-856A steam leak at gland |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 16 Sept 2025 | 3 | 201000028192 | Corrective |