Sparely
DU

GASKET,RING,12IN,150#,GR/304

Material 4100016281 · GASKET · Plant 1000

AReorderNormalBelow reorder point
Material
4100016281
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 9 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 49 EA/year: 49 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~31 days; expected demand during lead time 4.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 25, order up to 74.
  • 4.On hand 6 + on order 0 is at or below the reorder point: order 68 now.
  • 5.Installed on 9 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
68 EA
Rp 14.6M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Price estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
5 / 8
static parameters in BoM
Rec. Min (reorder point)
25
safety stock 21
Rec. Max
74
order qty 49
Service level
100.0%
stockout risk now 20%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 104 days ago, 24 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 9 functional locations

5 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_HE-1334B
BOTTOM CONDENSER
A182.36
PX_HE-1074
C3 RECYCLE REBOILER
A131.08
PX_CL-1833
CHARGE GAS COLUMN
A100.38
PX_TCV-1375
VD-708 TEMP CONTROL
B100.12
PX_HE-1912
QUENCH OIL EXCHANGER
C141.08
PX_KT-447
TURBINE FOR KC-447
S1136.24
PX_VD-928B
C3 RECYCLE ACCUMULATOR
S100.08
PX_VD-934
FLUSHING OIL SEPARATOR
S100.08

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
15 Sept 2026MediumPX_BF-106Install cover plate BF-106
14 Sept 2026LowPX_BF-106Peep door broken BF-106
10 Sept 2026MediumPX_BF-106Replace burner tip BF-106
08 Sept 2026LowPX_BF-106Leak from packing
08 Sept 2026MediumPX_BF-106Painting BF-106
03 Sept 2026MediumPX_BF-106Install cover plate for MCP cracking

Recent goods issues

Posting dateQtyOrderOrder type
19 Jun 20262201000022104Corrective
01 Aug 20258201000018941Corrective