Sparely
DU

GASKET,SHEET,3IN,150#,GR/304

Material 4100016423 · GASKET · Plant 1000

AReorderNormalBelow reorder point
Material
4100016423
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 4 FuncLocs A/B)
Supplier
NUSA ELEKTRIK SENTOSA PT
Lead time
25 d · P80 51 d
Unit price
Rp 2.2M

Recommendation

  • 1.Forecast 6.0 EA/year: 5.3 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~25 days; expected demand during lead time 0.4.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 11.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 8 now.
  • 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 17.3M · order by 01 Oct 2026
Expected arrival ≈ 25 days
Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
11
order qty 7
Service level
99.6%
stockout risk now 9%
Unit price
Rp 2.2M
PO history
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 114 days ago, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 425.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 4 functional locations

1 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-574B
INHIBITOR TLE
A400.22
PX_8-P-21146-A41A-T
PIPE-8 FROM VD-884 TO PP-1752A
C110.01
PX_LCV-1953
HE-1441D LEVEL CONTROL
C210.12
PX_KT-264A
TURBINE FOR KC-264A
S142.39

Lead time and procurement

Lead time 25 ± 16 days (PO history + category, 2 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
06 Jul 2026PR03
Regular replenishment
4Rp 2.2M15 Jul 20269 d
30 Dec 2025PR03
Regular replenishment
3Rp 2.1M21 Jan 202622 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Jun 2026LowPX_KT-264ALeak from packing
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
21 Oct 2025MediumPX_KT-264AKT-264A governor valve hunting
31 May 2025MediumPX_KT-264AInstall scaffolding at KT-264A
22 May 2025LowPX_8-P-21146-A41A-TLeak at 8-P-21146-A41A-T
10 May 2025MediumPX_LCV-1953Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
09 Jun 20264201000006748Corrective
16 Oct 20254201000025573Corrective