GASKET,SHEET,1IN,150#,GR/304
Material 4100016460 · GASKET · Plant 1000
ASafety-criticalReorderCriticalInsurance gap
- Material
- 4100016460
- Category
- GASKET
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 2 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 1.5 EA/year: 1.5 unplanned (installed-base failure prior (no history)).
- 3.Lead time ~31 days; expected demand during lead time 0.1.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
- 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 1.7M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
99.9%
stockout risk now 4%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 152.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-109 CRACKING FURNACE BF-109 | A | 1 | 29 | 11.58 |
| PX_PRV-1372 SAFETY VALVE KC-536A | C | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Sept 2026 | Medium | PX_BF-109 | Thermograph wall BF-109 |
| 13 Sept 2026 | Medium | PX_BF-109 | Install scaffolding at BF-109 |
| 03 Sept 2026 | Low | PX_BF-109 | Install scaffolding at BF-109 |
| 02 Sept 2026 | Low | PX_BF-109 | Install cover plate for MCP cracking |
| 16 Aug 2026 | Medium | PX_BF-109 | Install cover plate BF-109 |
| 13 Jul 2026 | Medium | PX_BF-109 | Cleaning burner BF-109 |
| 09 Jul 2026 | Medium | PX_BF-109 | Thermograph wall BF-109 |
| 09 Jul 2026 | Low | PX_BF-109 | Leak from packing |
| 01 Jul 2026 | Emergency | PX_BF-109 | [MSI-B-26-YDN-280/M] Replace line |
| 23 Jun 2026 | High | PX_BF-109 | Cleaning burner BF-109 |
Recent goods issues
Never issued in the 17-month history.