GASKET,SHEET,3/4IN,600#,GRAPHITE
Material 4100016488 · GASKET · Plant 1000
CReduceNon-moving
- Material
- 4100016488
- Category
- GASKET
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 1.0 EA/year: 0.3 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
- 2.Lead time ~31 days; expected demand during lead time 0.0.
- 3.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
- 4.Stock 7 exceeds the level to keep (4) by 3.
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
7 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
99.2%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 739,386/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~15 days.
Installed on 3 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_1-LS-20681-A11A PIPE-1 FROM HE-966 TO PP-1765B | C | 1 | 1 | 0.01 |
| PX_3-P-18222-B22A-T PIPE-3 FROM VD-1642 TO PP-278 | C | 1 | 0 | 0.01 |
| PX_KT-264A TURBINE FOR KC-264A | S | 1 | 4 | 2.39 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Jun 2026 | Low | PX_KT-264A | Leak from packing |
| 21 Apr 2026 | Low | PX_KT-264A | Follow up after steam upset KT-264A |
| 21 Oct 2025 | Medium | PX_KT-264A | KT-264A governor valve hunting |
| 31 May 2025 | Medium | PX_KT-264A | Install scaffolding at KT-264A |
| 11 May 2025 | Medium | PX_1-LS-20681-A11A | [MSI-B-25-KNB-190/M] Replace line |
Recent goods issues
Never issued in the 17-month history.