Sparely
DU

GASKET,SHEET,4IN,300#,GRAPHITE

Material 4100016509 · GASKET · Plant 1000

CReorderNormalSlow-moving
Material
4100016509
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 2.1 EA/year: 2.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~31 days; expected demand during lead time 0.2.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 5.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 3 now.
Proposed purchase requisition
3 EA
Rp 643,361 · order by 01 Oct 2026
Expected arrival ≈ 31 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
5
order qty 3
Service level
99.6%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 423 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 7.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~15 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-109-DUCT14
COIL OUTLET BF-109
C110.87
PX_KT-624A
TURBINE FOR KC-624A
S132.39

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
07 Feb 2026MediumPX_KT-624AReplace lamp as per PM finding
29 Aug 2025HighPX_BF-109-DUCT14Replace lamp as per PM finding
17 Jun 2025MediumPX_KT-624A[MSI-B-25-SWV-127/M] Replace line

Recent goods issues

Posting dateQtyOrderOrder type
04 Aug 20252201000038329Corrective