Sparely
DU

GASKET,RING,1-1/2IN,150#,GR/304

Material 4100016544 · GASKET · Plant 1000

AMonitorCritical insurance spare
Material
4100016544
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
CAHAYA PERKASA ABADI PT
Lead time
46 d · P80 51 d
Unit price
Rp 2.2M

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~46 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
99.9%
stockout risk now 0%
Unit price
Rp 2.2M
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-589D
SEAL OIL PREHEATER
A100.22

Lead time and procurement

Lead time 46 ± 16 days (PO history + category, 2 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
11 Oct 2025PR05
Project / turnaround
2Rp 2.2M21 Jan 2026102 d
17 May 2025PR10
Other
2Rp 2.1M19 Jun 202533 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.