GASKET,SHEET,3/4IN,150#,PTFE

Material 4100016676 · GASKET · Plant 1000

ASafety-criticalReorderCriticalInsurance gap
Material
4100016676
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 3 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 3.9 EA/year: 3.9 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~31 days; expected demand during lead time 0.3.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 11.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 11 now.
  • 6.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
11 EA
Rp 2.4M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 7
Rec. Max
11
order qty 4
Service level
100.0%
stockout risk now 10%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 15 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 385.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 3 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A37128.72
PX_KC-155D
CAUSTIC BLOWER
A100.57
PX_PRV-1688
SAFETY VALVE KC-505D
S100.04

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
07 Sept 2026LowPX_BF-102Thermograph wall BF-102
06 Sept 2026MediumPX_BF-102Decoking follow up BF-102
03 Sept 2026MediumPX_BF-102Replace lamp as per PM finding
30 Aug 2026HighPX_BF-102Painting BF-102
27 Aug 2026MediumPX_BF-102Decoking follow up BF-102
14 Aug 2026EmergencyPX_BF-102Thermograph wall BF-102
12 Aug 2026HighPX_BF-102Peep door broken BF-102
12 Aug 2026HighPX_BF-102Replace lamp as per PM finding
01 Aug 2026HighPX_BF-102Replace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.