GASKET,RING,1/2IN,150#,GR/304

Material 4100016692 · GASKET · Plant 1000

AReduceNon-moving
Material
4100016692
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~31 days; expected demand during lead time 0.0.
  • 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
  • 4.Stock 7 exceeds the level to keep (4) by 3.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
7 / 0
no open PO
Today Min / Max
5 / 14
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
99.4%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 24.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TCV-515
TEMPERATURE CONTROL VALVE
A151.83
PX_3/4-MS-11706-A51A-H
PIPE-3/4 FROM PP-1348 TO HE-1982
A100.01

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Apr 2026MediumPX_TCV-515TCV-515; valve hunting
20 Dec 2025LowPX_TCV-515Overhaul TCV-515
05 Nov 2025LowPX_TCV-515[MSI-B-25-VVY-210] Permanent repair
12 Oct 2025LowPX_TCV-515TCV-515 stuck
25 Jun 2025LowPX_TCV-515Install scaffolding at TCV-515

Recent goods issues

Never issued in the 17-month history.