GASKET,SHEET,2IN,300#,GRAPHITE

Material 4100016830 · GASKET · Plant 1000

ASafety-criticalReorderCriticalInsurance gap
Material
4100016830
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.2 EA/year: 1.2 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~31 days; expected demand during lead time 0.1.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 1.7M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
100.0%
stockout risk now 3%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 119.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-111
CRACKING FURNACE BF-111
A1239.01
PX_SDV-1525B
ON-OFF VALVE
S100.06

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
03 Aug 2026MediumPX_BF-111Thermograph wall BF-111
11 Jul 2026MediumPX_BF-111Thermograph wall BF-111
27 Jun 2026MediumPX_BF-111Leak from packing
08 May 2026MediumPX_BF-111Repair refractory crack BF-111
20 Apr 2026EmergencyPX_BF-111Cleaning burner BF-111
16 Apr 2026MediumPX_BF-111Replace lamp as per PM finding
20 Mar 2026MediumPX_BF-111Painting BF-111
06 Mar 2026LowPX_BF-111Install cover plate for MCP cracking

Recent goods issues

Never issued in the 17-month history.