GASKET,SHEET,4IN,150#,PTFE
Material 4100016866 · GASKET · Plant 1000
ASafety-criticalReduceSlow-moving
- Material
- 4100016866
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- GEMILANG LOGAM MAKMUR PT
- Lead time
- 28 d · P80 27 d
- Unit price
- Rp 804,190
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~28 days; expected demand during lead time 0.1.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 5.Stock 13 exceeds the level to keep (4) by 9.
- 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Safety-critical (SCE)Single source
On hand / on order
13 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 804,190
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 353 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 105.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-995 SAFETY VALVE PP-1830B | A | 1 | 2 | 0.47 |
| PX_PP-1797 CHARGE GAS PUMP | A | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 28 ± 9 days (PO history, 3 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 29 Sept 2025 | PR03 Regular replenishment | 2 | Rp 804,190 | 23 Oct 2025 | 24 d |
| 29 Jul 2025 | PR03 Regular replenishment | 1 | Rp 789,042 | 24 Aug 2025 | 26 d |
| 16 Jul 2025 | PR03 Regular replenishment | 2 | Rp 828,647 | 12 Aug 2025 | 27 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 Oct 2025 | Medium | PX_PRV-995 | Replace lamp as per PM finding |
| 16 May 2025 | Medium | PX_PRV-995 | Recertification PRV-995 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 Oct 2025 | 2 | 204000000302 | Preventive |