GASKET,SHEET,10IN,300#,GRAPHITE
Material 4100016939 · GASKET · Plant 1000
SReducePotentially obsolete
- Material
- 4100016939
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 0.4 EA/year: 0.4 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~31 days; expected demand during lead time 0.0.
- 3.A 98.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
- 4.Stock 66 exceeds the level to keep (4) by 62.
Price estimatedLead time estimated
On hand / on order
66 / 0
no open PO
Today Min / Max
10 / 28
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
98.8%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 262,451/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~15 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-268 CAUSTIC SCRUBBER | S | 1 | 8 | 3.38 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Sept 2026 | Low | PX_CL-268 | Replace lamp as per PM finding |
| 23 Mar 2026 | Low | PX_CL-268 | Inspect CL-268 internal |
| 14 Nov 2025 | Low | PX_CL-268 | Install scaffolding at CL-268 |
| 08 Nov 2025 | Medium | PX_CL-268 | Replace lamp as per PM finding |
| 21 Oct 2025 | Medium | PX_CL-268 | Leak from packing |
| 21 Sept 2025 | Medium | PX_CL-268 | CL-268 DP high |
| 15 Aug 2025 | Medium | PX_CL-268 | Leak from packing |
| 21 Jun 2025 | Medium | PX_CL-268 | PSM25/CL-268 DP high |
Recent goods issues
Never issued in the 17-month history.