GASKET,SW,1-1/2IN,150#,GRAPHITE
Material 4100017013 · GASKET · Plant 1000
BReduceNon-moving
- Material
- 4100017013
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (2 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 0.4 EA/year: 0.4 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~31 days; expected demand during lead time 0.0.
- 3.A 98.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
- 4.Stock 5 exceeds the level to keep (4) by 1.
- 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
4 / 7
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
98.9%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 10.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.
Installed on 4 functional locations
2 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-483B LEAN AMINE PUMP | B | 1 | 5 | 1.90 |
| PX_HE-495C CAUSTIC TLE | B | 1 | 0 | 0.22 |
| PX_HE-1547C DEMIN WATER PREHEATER | C | 1 | 3 | 0.65 |
| PX_BF-102-PD10 COIL OUTLET BF-102 | C | 1 | 0 | 0.45 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Aug 2026 | Medium | PX_PP-483B | PP-483B abnormal noise |
| 29 Jun 2026 | Medium | PX_PP-483B | Oil leak at PP-483B bearing housing |
| 06 May 2026 | Medium | PX_HE-1547C | [MSI-B-26-ZAH-285] Permanent repair |
| 18 Nov 2025 | Medium | PX_PP-483B | Leak from packing |
| 18 Nov 2025 | Medium | PX_PP-483B | Replace lamp as per PM finding |
| 08 Nov 2025 | Medium | PX_HE-1547C | Install scaffolding at HE-1547C |
| 24 May 2025 | Medium | PX_PP-483B | Install scaffolding at PP-483B |
| 22 May 2025 | Medium | PX_HE-1547C | HE-1547C tube leak |
Recent goods issues
Never issued in the 17-month history.