GASKET,SW,12IN,600#,PTFE

Material 4100017014 · GASKET · Plant 1000

AReduceSlow-moving
Material
4100017014
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~31 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 4.Stock 214 exceeds the level to keep (18) by 196; the level includes the 18 used in the last turnaround.
  • 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Last turnaround used 18Price estimatedLead time estimated
On hand / on order
214 / 0
no open PO
Today Min / Max
5 / 10
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (18 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 54.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 4 functional locations

3 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_VD-664B
METHANE KO DRUM
A330.93
PX_CL-440
RECYCLE ETHANE SCRUBBER
B100.38
PX_3/4-FG-25152-A11A-T
PIPE-3/4 FROM PP-336A TO PP-700
C100.01

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Jul 2026MediumPX_VD-664BLeak from packing
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding
14 May 2026LowPX_KT-397AKT-397A trip test
02 Apr 2026MediumPX_KT-397AFollow up after steam upset KT-397A
27 Nov 2025MediumPX_VD-664BVD-664B level glass broken
30 May 2025LowPX_VD-664BLeak from packing
10 May 2025MediumPX_KT-397ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
21 Dec 202514203000022966Turnaround
21 Dec 20254203000022966Turnaround