Sparely
DU

GASKET,RING,10IN,300#,GR/304

Material 4100017089 · GASKET · Plant 1000

AReduceExcess
Material
4100017089
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
KARYA UTAMA GLOBAL PT
Lead time
24 d · P80 51 d
Unit price
Rp 38,617

Recommendation

  • 1.Forecast 10 EA/year: 10 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~24 days; expected demand during lead time 0.7.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 22.
  • 4.Stock 25 exceeds the level to keep (22) by 3.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Convert to Stock ItemSingle source
On hand / on order
25 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 11
Rec. Max
22
order qty 11
Service level
100.0%
stockout risk now 0%
Unit price
Rp 38,617
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 80 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 599.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-536A
LUBE OIL BLOWER
A1114.42

Lead time and procurement

Lead time 24 ± 16 days (PO history + category, 2 PO lines) · on-time 45%

PR dateTypeQtyUnit priceDeliveryLead time
16 Feb 2026PR06
Regular replenishment
4Rp 38,09908 Mar 202620 d
20 Dec 2025PR03
Regular replenishment
3Rp 39,13428 Dec 20258 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026HighPX_KC-536AOverhaul
08 Aug 2026HighPX_KC-536AKC-536A bearing temp high
24 Jul 2026HighPX_KC-536AInstall scaffolding at KC-536A
05 Jul 2026MediumPX_KC-536ALeak from packing
24 Jun 2026MediumPX_KC-536AKC-536A bearing temp high
31 Mar 2026MediumPX_KC-536AInstall scaffolding at KC-536A
18 Jan 2026LowPX_KC-536AReplace lamp as per PM finding
10 Jan 2026LowPX_KC-536AKC-536A bearing temp high
17 Nov 2025MediumPX_KC-536AOverhaul
08 Nov 2025MediumPX_KC-536AInspect coupling KC-536A

Recent goods issues

Posting dateQtyOrderOrder type
13 Jul 20267201000001615Corrective
30 Jan 20264201000036633Corrective