GASKET,RING,1IN,150#,GRAPHITE

Material 4100017111 · GASKET · Plant 1000

BReorderNormalSlow-moving
Material
4100017111
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
B (2 of 5 FuncLocs A/B)
Supplier
GEMILANG MANDIRI INTERNASIONAL PT
Lead time
26 d · P80 51 d
Unit price
Rp 288,698

Recommendation

  • 1.Forecast 2.3 EA/year: 2.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~26 days; expected demand during lead time 0.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 1.2M · order by 01 Oct 2026
Expected arrival ≈ 26 days
Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 288,698
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 455 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 95.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.

Installed on 5 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-589B
PP-389 LEVEL CONTROL
B120.55
PX_MOV-1696
MOTOR OPERATED GATE VALVE
B100.06
PX_PCV-1859
BY PASS DUCT
C141.36
PX_CL-1165
HYDROGEN TOWER
S151.23
PX_KC-293B
C4 PRODUCT COMPRESSOR
S100.57

Lead time and procurement

Lead time 26 ± 16 days (PO history + category, 1 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
12 Nov 2025PR06
Regular replenishment
2Rp 288,69823 Nov 202511 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 May 2026LowPX_LCV-589BLCV-589B stuck
16 Apr 2026MediumPX_PCV-1859Replace lamp as per PM finding
13 Jan 2026HighPX_CL-1165Install scaffolding at CL-1165
22 Dec 2025MediumPX_PCV-1859PCV-1859; small leak at packing
07 Dec 2025MediumPX_CL-1165Replace lamp as per PM finding
01 Dec 2025MediumPX_CL-1165Install scaffolding at CL-1165
13 Nov 2025LowPX_PCV-1859Overhaul PCV-1859
27 Sept 2025MediumPX_CL-1165CL-1165 DP high
03 Aug 2025LowPX_CL-1165Install scaffolding at CL-1165
28 May 2025MediumPX_PCV-1859Overhaul PCV-1859

Recent goods issues

Posting dateQtyOrderOrder type
03 Jul 20252201000026142Corrective