GASKET,RING,1IN,150#,GRAPHITE
Material 4100017111 · GASKET · Plant 1000
BReorderNormalSlow-moving
- Material
- 4100017111
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (2 of 5 FuncLocs A/B)
- Supplier
- GEMILANG MANDIRI INTERNASIONAL PT
- Lead time
- 26 d · P80 51 d
- Unit price
- Rp 288,698
Recommendation
- 1.Forecast 2.3 EA/year: 2.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~26 days; expected demand during lead time 0.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
- 4.On hand 3 + on order 0 is at or below the reorder point: order 4 now.
- 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 1.2M · order by 01 Oct 2026
Expected arrival ≈ 26 days
Single source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 288,698
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 455 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 95.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.
Installed on 5 functional locations
2 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-589B PP-389 LEVEL CONTROL | B | 1 | 2 | 0.55 |
| PX_MOV-1696 MOTOR OPERATED GATE VALVE | B | 1 | 0 | 0.06 |
| PX_PCV-1859 BY PASS DUCT | C | 1 | 4 | 1.36 |
| PX_CL-1165 HYDROGEN TOWER | S | 1 | 5 | 1.23 |
| PX_KC-293B C4 PRODUCT COMPRESSOR | S | 1 | 0 | 0.57 |
Lead time and procurement
Lead time 26 ± 16 days (PO history + category, 1 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 12 Nov 2025 | PR06 Regular replenishment | 2 | Rp 288,698 | 23 Nov 2025 | 11 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 May 2026 | Low | PX_LCV-589B | LCV-589B stuck |
| 16 Apr 2026 | Medium | PX_PCV-1859 | Replace lamp as per PM finding |
| 13 Jan 2026 | High | PX_CL-1165 | Install scaffolding at CL-1165 |
| 22 Dec 2025 | Medium | PX_PCV-1859 | PCV-1859; small leak at packing |
| 07 Dec 2025 | Medium | PX_CL-1165 | Replace lamp as per PM finding |
| 01 Dec 2025 | Medium | PX_CL-1165 | Install scaffolding at CL-1165 |
| 13 Nov 2025 | Low | PX_PCV-1859 | Overhaul PCV-1859 |
| 27 Sept 2025 | Medium | PX_CL-1165 | CL-1165 DP high |
| 03 Aug 2025 | Low | PX_CL-1165 | Install scaffolding at CL-1165 |
| 28 May 2025 | Medium | PX_PCV-1859 | Overhaul PCV-1859 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Jul 2025 | 2 | 201000026142 | Corrective |