GASKET,SW,12IN,600#,GR/304

Material 4100017120 · GASKET · Plant 1000

ASafety-criticalReorderNormalSlow-moving
Material
4100017120
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 6 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 2.4 EA/year: 2.4 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~31 days; expected demand during lead time 0.2.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 7.
  • 5.On hand 4 + on order 0 is at or below the reorder point: order 3 now.
  • 6.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 643,361 · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
7
order qty 3
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 208 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 385.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 6 functional locations

4 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_TCV-413C
TEMPERATURE CONTROL VALVE
A120.12
PX_PP-592
FLUSHING OIL PUMP
A110.19
PX_VD-1291
C4 PRODUCT DRUM
B100.08
PX_PCV-1386
PRESSURE CONTROL VALVE
C100.08
PX_SDV-1127
ON-OFF VALVE
C200.06

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Aug 2026HighPX_TCV-413CInstall scaffolding at TCV-413C
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting
16 Nov 2025LowPX_KT-856AInstall scaffolding at KT-856A
04 Sept 2025LowPX_KT-856AInstall scaffolding at KT-856A
26 Aug 2025LowPX_KT-856AReplace lamp as per PM finding
28 May 2025LowPX_TCV-413CTCV-413C stuck
24 May 2025LowPX_PP-592Install scaffolding at PP-592
09 May 2025MediumPX_KT-856APSM25/KT-856A steam leak at gland

Recent goods issues

Posting dateQtyOrderOrder type
07 Mar 20262201000004574Corrective