GASKET,SHEET,1/2IN,600#,PTFE

Material 4100017175 · GASKET · Plant 1000

AReorderCriticalStockout
Material
4100017175
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 4 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA INTERNASIONAL PT
Lead time
34 d · P80 51 d
Unit price
Rp 37,012

Recommendation

  • 1.Forecast 3.4 EA/year: 3.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~34 days; expected demand during lead time 0.3.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
  • 5.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 296,096 · order by 01 Oct 2026
Expected arrival ≈ 34 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
99.9%
stockout risk now 15%
Unit price
Rp 37,012
PO history
ML early warning: 27% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 275 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 553.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 4 functional locations

4 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-854C
FEED FAN
A172.28
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_PP-1033
CAUSTIC PUMP
A100.19
PY_VD-1729
METHANE KO DRUM
A100.08

Lead time and procurement

Lead time 34 ± 16 days (PO history + category, 2 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
17 Jun 2026PR03
Regular replenishment
1Rp 36,53504 Aug 202648 d
24 Sept 2025PR03
Regular replenishment
1Rp 37,48925 Oct 202531 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026MediumPX_KC-854COverhaul
29 Jul 2026MediumPX_KC-854CInstall scaffolding at KC-854C
17 Jul 2026LowPX_KC-854CPainting KC-854C
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
13 Mar 2026MediumPX_KC-854CKC-854C bearing temp high
22 Nov 2025MediumPX_KC-854CKC-854C lube oil filter DP high
20 Nov 2025MediumPX_KT-419ALeak from packing
10 Nov 2025MediumPX_KT-419APainting KT-419A
14 Sept 2025MediumPX_KC-854C[MSI-B-25-TSW-309] Permanent repair

Recent goods issues

Posting dateQtyOrderOrder type
30 Dec 20252201000026881Corrective