GASKET,SHEET,1IN,300#,PTFE
Material 4100017230 · GASKET · Plant 1000
ASafety-criticalReorderNormalSlow-moving
- Material
- 4100017230
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 6.8 EA/year: 6.8 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~31 days; expected demand during lead time 0.6.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 19.
- 5.On hand 3 + on order 0 is at or below the reorder point: order 16 now.
- 6.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
16 EA
Rp 3.4M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 12
Rec. Max
19
order qty 7
Service level
100.0%
stockout risk now 9%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 284 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 363.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 4 functional locations
3 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-867D CONDENSATE FAN | A | 1 | 6 | 2.71 |
| PX_BF-111-PD31 CONVECTION SECTION | A | 1 | 0 | 0.45 |
| PX_PRV-1448A SAFETY VALVE VD-664B | A | 1 | 0 | 0.04 |
| PX_TCV-1857D TEMPERATURE CONTROL VALVE | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 17 Sept 2026 | Medium | PX_KC-867D | Leak from packing |
| 11 Jul 2026 | Medium | PX_KC-867D | KC-867D bearing temp high |
| 03 Jun 2026 | Low | PX_KC-867D | Leak from packing |
| 20 Nov 2025 | Medium | PX_KC-867D | Inspect coupling KC-867D |
| 26 Oct 2025 | Medium | PX_KC-867D | Overhaul |
| 24 May 2025 | Medium | PX_KC-867D | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Dec 2025 | 6 | 201000039741 | Corrective |