GASKET,SHEET,6IN,600#,GR/304
Material 4100017253 · GASKET · Plant 1000
CReduceExcess
- Material
- 4100017253
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 1.2 EA/year: 0.4 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
- 2.Lead time ~31 days; expected demand during lead time 0.0.
- 3.A 98.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
- 4.Stock 108 exceeds the level to keep (4) by 104.
Price estimatedLead time estimated
On hand / on order
108 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
98.8%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (6 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~15 days.
Installed on 3 functional locations
0 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TCV-212 TEMPERATURE CONTROL VALVE | C | 1 | 4 | 0.98 |
| PX_ROF-545 RESTRICTION ORIFICE | C | 2 | 0 | 0.00 |
| PX_KT-624A TURBINE FOR KC-624A | S | 1 | 3 | 2.39 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Sept 2027 | PX_TCV-212 | Final Element Overhaul; Control Valve | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 15 Jul 2026 | Medium | PX_KT-624A | [MSI-B-26-RXR-331/M] Replace line |
| 26 Mar 2026 | Low | PX_TCV-212 | Overhaul TCV-212 |
| 20 Mar 2026 | Medium | PX_TCV-212 | TCV-212 stuck |
| 07 Feb 2026 | Medium | PX_KT-624A | Replace lamp as per PM finding |
| 13 Oct 2025 | Low | PX_TCV-212 | Painting TCV-212 |
| 17 Jun 2025 | Medium | PX_KT-624A | [MSI-B-25-SWV-127/M] Replace line |
| 26 May 2025 | Low | PX_TCV-212 | Install scaffolding at TCV-212 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Apr 2026 | 6 | 203000029810 | Turnaround |