Sparely
DU

GASKET,SW,3/4IN,600#,PTFE

Material 4100017307 · GASKET · Plant 1000

BReorderCriticalStockout
Material
4100017307
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 1.1 EA/year: 0.4 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~31 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 1.7M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
100.0%
stockout risk now 1%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-389
PRESSURE CONTROL VALVE
B110.08
PX_1-LS-22184-A22A-C
PIPE-1 FROM PP-160B TO HE-118B
C100.01
PX_KC-575B
METHANE COMPRESSOR
S172.71

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Mar 2027PX_PCV-389Final Element Overhaul; CV0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_KC-575BInstall scaffolding at KC-575B
15 Jul 2026LowPX_KC-575BReplace lamp as per PM finding
20 Mar 2026MediumPX_KC-575BKC-575B bearing temp high
13 Dec 2025MediumPX_KC-575BReplace lamp as per PM finding
03 Nov 2025EmergencyPX_KC-575BReplace lamp as per PM finding
05 Sept 2025MediumPX_KC-575BInstall scaffolding at KC-575B
05 Jun 2025MediumPX_KC-575BOverhaul
22 May 2025MediumPX_PCV-389PCV-389; small leak at packing

Recent goods issues

Never issued in the 17-month history.