GASKET,SHEET,4IN,300#,PTFE
Material 4100017368 · GASKET · Plant 1000
ASafety-criticalReorderCriticalStockout
- Material
- 4100017368
- Category
- GASKET
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 2 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- GUNUNG SARANA SENTOSA PT
- Lead time
- 25 d · P80 24 d
- Unit price
- Rp 3.0M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~25 days; expected demand during lead time 0.1.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
- 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 11.8M · order by 01 Oct 2026
Expected arrival ≈ 25 days
Safety-critical (SCE)Convert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.9%
stockout risk now 4%
Unit price
Rp 3.0M
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 146 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 217.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-1200D REFLUX PREHEATER | A | 1 | 0 | 0.22 |
| PX_PRV-1866D SAFETY VALVE PP-506A | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 25 ± 13 days (PO history, 3 PO lines) · on-time 45%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 06 Mar 2026 | PR05 Project / turnaround | 1 | Rp 3.0M | 01 Apr 2026 | 26 d |
| 22 Nov 2025 | PR06 Regular replenishment | 1 | Rp 3.1M | 30 Nov 2025 | 8 d |
| 10 Aug 2025 | PR03 Regular replenishment | 2 | Rp 2.9M | 01 Sept 2025 | 22 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 May 2026 | 2 | 201000028932 | Corrective |
| 29 Jul 2025 | 1 | 201000012996 | Corrective |