GASKET,SW,1/4IN,300#,GRAPHITE

Material 4100017372 · GASKET · Plant 1000

SMonitorInsurance gap
Material
4100017372
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA INTERNASIONAL PT
Lead time
41 d · P80 51 d
Unit price
Rp 86,086

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~41 days; expected demand during lead time 0.0.
  • 3.A 98.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
Insurance spare candidateSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
98.9%
stockout risk now 1%
Unit price
Rp 86,086
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 185,462/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~15 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-624A
TURBINE FOR KC-624A
S132.39

Lead time and procurement

Lead time 41 ± 16 days (PO history + category, 1 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
11 Feb 2026PR01
Import / long-lead
2Rp 86,08623 Apr 202671 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
07 Feb 2026MediumPX_KT-624AReplace lamp as per PM finding
17 Jun 2025MediumPX_KT-624A[MSI-B-25-SWV-127/M] Replace line

Recent goods issues

Never issued in the 17-month history.