GASKET,SW,6IN,300#,PTFE

Material 4100017426 · GASKET · Plant 1000

BMonitorCritical insurance spare
Material
4100017426
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~31 days; expected demand during lead time 0.0.
  • 3.A 98.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
98.9%
stockout risk now 1%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 10.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1155C
CONDENSATE PUMP
B193.19
PX_3/4-BF-12683-A21A
PIPE-3/4 FROM PP-301C TO HE-1205D
C100.01

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jun 2026HighPX_PP-1155COverhaul PP-1155C
20 May 2026MediumPX_PP-1155CPP-1155C discharge pressure low
18 Apr 2026MediumPX_PP-1155CLeak from packing
18 Mar 2026MediumPX_PP-1155CInstall scaffolding at PP-1155C
27 Jan 2026MediumPX_PP-1155CPP-1155C discharge pressure low
16 Nov 2025MediumPX_PP-1155CReplace lamp as per PM finding
24 Oct 2025MediumPX_PP-1155CPP-1155C discharge pressure low
13 Sept 2025HighPX_PP-1155CReplace bearing PP-1155C
06 May 2025MediumPX_PP-1155CPP-1155C discharge pressure low

Recent goods issues

Never issued in the 17-month history.