GASKET,RING,6IN,150#,GR/304
Material 4100017493 · GASKET · Plant 1000
ASafety-criticalMonitorSlow-moving
- Material
- 4100017493
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 1.4 EA/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~31 days; expected demand during lead time 0.1.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 376 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 224.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_PRV-980 SAFETY VALVE PP-953A | A | 1 | 0 | 0.04 |
| PX_ROF-1643 RESTRICTION ORIFICE | C | 1 | 0 | 0.00 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 Dec 2025 | Low | PX_KT-460B | KT-460B governor valve hunting |
| 27 Jul 2025 | Medium | PX_KT-460B | Follow up after steam upset KT-460B |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Sept 2025 | 2 | 201000007021 | Corrective |