GASKET,SHEET,10IN,300#,GR/304

Material 4100017553 · GASKET · Plant 1000

AReorderCriticalSlow-moving
Material
4100017553
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 32 EA/year: 32 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~31 days; expected demand during lead time 2.7.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 40, order up to 73.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 71 now.
  • 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
71 EA
Rp 15.2M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
40
safety stock 38
Rec. Max
73
order qty 33
Service level
100.0%
stockout risk now 13%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 337 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 515.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 3 functional locations

3 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1776B
RICH AMINE PUMP
A183.62
PX_PP-1471A
METHANE PUMP
A141.47
PX_ROF-1988
LP STEAM TO KC-216B
B100.00

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Sept 2026MediumPX_PP-1471AReplace lamp as per PM finding
10 Jul 2026LowPX_PP-1776BPP-1776B seal leak
03 Jun 2026HighPX_PP-1776BPP-1776B discharge pressure low
05 Apr 2026MediumPX_PP-1471AReplace bearing PP-1471A
03 Jan 2026MediumPX_PP-1776BPP-1776B discharge pressure low
27 Dec 2025LowPX_PP-1471ALeak from packing
10 Nov 2025MediumPX_PP-1776BLeak from packing
31 Oct 2025LowPX_PP-1776BPP-1776B seal leak
13 Oct 2025MediumPX_PP-1776B[MSI-B-25-GDF-159] Permanent repair
23 Sept 2025LowPX_PP-1776BLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
29 Oct 202520201000012862Corrective