GASKET,SW,6IN,600#,GRAPHITE
Material 4100017603 · GASKET · Plant 1000
ASafety-criticalMonitorSlow-moving
- Material
- 4100017603
- Category
- GASKET
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 2 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 2.6 EA/year: 1.9 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 3.Lead time ~31 days; expected demand during lead time 0.2.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 14.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Safety-critical (SCE)Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
12 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 7
Rec. Max
14
order qty 7
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 249 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 87.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 2 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1541 DEMIN WATER PUMP | A | 1 | 0 | 0.19 |
| PX_PRV-625D SAFETY VALVE BF-104 | B | 2 | 0 | 0.04 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 02 Jun 2027 | PX_PP-1541 | Pump overhaul | 0.72 |
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Jan 2026 | 7 | 201000027275 | Corrective |