GASKET,SW,6IN,600#,GRAPHITE

Material 4100017603 · GASKET · Plant 1000

ASafety-criticalMonitorSlow-moving
Material
4100017603
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 2 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 2.6 EA/year: 1.9 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 3.Lead time ~31 days; expected demand during lead time 0.2.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 14.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Safety-critical (SCE)Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
12 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 7
Rec. Max
14
order qty 7
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 249 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 87.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 2 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1541
DEMIN WATER PUMP
A100.19
PX_PRV-625D
SAFETY VALVE BF-104
B200.04

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Jun 2027PX_PP-1541Pump overhaul0.72

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
25 Jan 20267201000027275Corrective