Sparely
DU

GASKET,SHEET,3/4IN,150#,GR/304

Material 4100017764 · GASKET · Plant 1000

AReorderNormalSlow-moving
Material
4100017764
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
25 d · P80 51 d
Unit price
Rp 253,962

Recommendation

  • 1.Forecast 13 EA/year: 13 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~25 days; expected demand during lead time 0.9.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 18.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 16 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
16 EA
Rp 4.1M · order by 01 Oct 2026
Expected arrival ≈ 25 days
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
18
order qty 13
Service level
100.0%
stockout risk now 6%
Unit price
Rp 253,962
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 420 days ago, 21 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A111442.86
PX_KC-150A
HYDROGEN FAN
S121.00

Lead time and procurement

Lead time 25 ± 16 days (PO history + category, 2 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
19 Jul 2026PR03
Regular replenishment
2Rp 255,85806 Aug 202618 d
21 Oct 2025PR06
Regular replenishment
1Rp 252,06603 Nov 202513 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026MediumPX_BF-105Thermograph wall BF-105
06 Sept 2026MediumPX_BF-105Repair insulation BF-105
01 Sept 2026LowPX_BF-105Peep door broken BF-105
30 Aug 2026MediumPX_BF-105Painting BF-105
29 Aug 2026MediumPX_BF-105Leak from packing
27 Aug 2026MediumPX_BF-105Thermograph wall BF-105

Recent goods issues

Posting dateQtyOrderOrder type
07 Aug 20251201000024523Corrective