GASKET,SHEET,3/4IN,150#,GR/304
Material 4100017764 · GASKET · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100017764
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 25 d · P80 51 d
- Unit price
- Rp 253,962
Recommendation
- 1.Forecast 13 EA/year: 13 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~25 days; expected demand during lead time 0.9.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 18.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 16 now.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
16 EA
Rp 4.1M · order by 01 Oct 2026
Expected arrival ≈ 25 days
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
18
order qty 13
Service level
100.0%
stockout risk now 6%
Unit price
Rp 253,962
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 420 days ago, 21 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 1 | 114 | 42.86 |
| PX_KC-150A HYDROGEN FAN | S | 1 | 2 | 1.00 |
Lead time and procurement
Lead time 25 ± 16 days (PO history + category, 2 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 19 Jul 2026 | PR03 Regular replenishment | 2 | Rp 255,858 | 06 Aug 2026 | 18 d |
| 21 Oct 2025 | PR06 Regular replenishment | 1 | Rp 252,066 | 03 Nov 2025 | 13 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 20 Sept 2026 | Medium | PX_BF-105 | Replace lamp as per PM finding |
| 20 Sept 2026 | Medium | PX_BF-105 | Install scaffolding at BF-105 |
| 14 Sept 2026 | Low | PX_BF-105 | Install cover plate BF-105 |
| 13 Sept 2026 | Medium | PX_BF-105 | Thermograph wall BF-105 |
| 06 Sept 2026 | Medium | PX_BF-105 | Repair insulation BF-105 |
| 01 Sept 2026 | Low | PX_BF-105 | Peep door broken BF-105 |
| 30 Aug 2026 | Medium | PX_BF-105 | Painting BF-105 |
| 29 Aug 2026 | Medium | PX_BF-105 | Leak from packing |
| 27 Aug 2026 | Medium | PX_BF-105 | Thermograph wall BF-105 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 07 Aug 2025 | 1 | 201000024523 | Corrective |