GASKET,SW,1IN,150#,GR/304
Material 4100017788 · GASKET · Plant 1000
AReduceNon-moving
- Material
- 4100017788
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~31 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
- 4.Stock 11 exceeds the level to keep (8) by 3.
- 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
11 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 49.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 4 functional locations
2 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_CL-894 COOLING WATER COLUMN | A | 1 | 1 | 0.38 |
| PX_TCV-779C PP-1798C TEMP CONTROL | A | 1 | 0 | 0.12 |
| PX_LCV-1627D LEVEL CONTROL VALVE | C | 1 | 0 | 0.12 |
| PX_KC-458D SLOP OIL FAN | S | 1 | 9 | 3.14 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Sept 2026 | Medium | PX_KC-458D | KC-458D lube oil filter DP high |
| 16 Sept 2026 | Low | PX_KC-458D | KC-458D lube oil filter DP high |
| 24 Jun 2026 | Medium | PX_KC-458D | KC-458D bearing temp high |
| 15 Mar 2026 | Medium | PX_KC-458D | Painting KC-458D |
| 27 Dec 2025 | Medium | PX_KC-458D | Install scaffolding at KC-458D |
| 09 Dec 2025 | Medium | PX_KC-458D | Overhaul |
| 24 Nov 2025 | Medium | PX_KC-458D | KC-458D lube oil filter DP high |
| 05 Sept 2025 | Low | PX_KC-458D | Replace lamp as per PM finding |
| 21 May 2025 | Medium | PX_KC-458D | Inspect coupling KC-458D |
| 09 May 2025 | Medium | PX_CL-894 | Replace lamp as per PM finding |
Recent goods issues
Never issued in the 17-month history.