Sparely
DU

GASKET,RING,4IN,600#,GRAPHITE

Material 4100017932 · GASKET · Plant 1000

AReduceSlow-moving
Material
4100017932
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
GUNUNG INDUSTRI PRATAMA PT
Lead time
31 d · P80 35 d
Unit price
Rp 33,906

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~31 days; expected demand during lead time 0.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.Stock 6 exceeds the level to keep (4) by 2.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single source
On hand / on order
6 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 33,906
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 465 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 167.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1913B
SPENT CAUSTIC REBOILER
A141.50

Lead time and procurement

Lead time 31 ± 11 days (PO history, 3 PO lines) · on-time 45%

PR dateTypeQtyUnit priceDeliveryLead time
30 Jun 2026PR03
Regular replenishment
1Rp 33,90630 Jul 202630 d
16 Jan 2026PR03
Regular replenishment
2Rp 34,86923 Feb 202638 d
25 Nov 2025PR03
Regular replenishment
2Rp 33,78222 Dec 202527 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
09 Sept 2026MediumPX_HE-1913BReplace lamp as per PM finding
07 Apr 2026HighPX_HE-1913BRetubing HE-1913B
07 Mar 2026MediumPX_HE-1913B[MSI-B-26-VLT-170/M] Replace line
31 May 2025LowPX_HE-1913BInstall cover plate for MCP cracking

Recent goods issues

Posting dateQtyOrderOrder type
23 Jun 20252201000011157Corrective