GASKET,SW,4IN,150#,GR/304
Material 4100017966 · GASKET · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100017966
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 3.8 EA/year: 3.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~31 days; expected demand during lead time 0.3.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 15.
- 4.On hand 6 + on order 0 is at or below the reorder point: order 9 now.
- 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
9 EA
Rp 1.9M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Price estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 10
Rec. Max
15
order qty 5
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 86 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 246.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 4 functional locations
1 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-179D RECYCLE ETHANE PREHEATER | A | 1 | 0 | 0.22 |
| PX_FCV-283B SLOP OIL FLOW CONTROL | C | 1 | 0 | 0.11 |
| PX_TCV-503 PP-1012C TEMP CONTROL | S | 1 | 2 | 0.55 |
| PX_BF-103-QF16 DILUTION STEAM TO MIXED FEED COIL | S | 1 | 0 | 0.45 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Apr 2026 | Emergency | PX_TCV-503 | TCV-503; small leak at packing |
| 07 May 2025 | Medium | PX_TCV-503 | Install scaffolding at TCV-503 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 07 Jul 2026 | 5 | 204000002628 | Preventive |