GASKET,SW,4IN,150#,GR/304

Material 4100017966 · GASKET · Plant 1000

AReorderNormalBelow reorder point
Material
4100017966
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Forecast 3.8 EA/year: 3.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~31 days; expected demand during lead time 0.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 15.
  • 4.On hand 6 + on order 0 is at or below the reorder point: order 9 now.
  • 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
9 EA
Rp 1.9M · order by 01 Oct 2026
Expected arrival ≈ 31 days
Price estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 10
Rec. Max
15
order qty 5
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 86 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 246.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 4 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-179D
RECYCLE ETHANE PREHEATER
A100.22
PX_FCV-283B
SLOP OIL FLOW CONTROL
C100.11
PX_TCV-503
PP-1012C TEMP CONTROL
S120.55
PX_BF-103-QF16
DILUTION STEAM TO MIXED FEED COIL
S100.45

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Apr 2026EmergencyPX_TCV-503TCV-503; small leak at packing
07 May 2025MediumPX_TCV-503Install scaffolding at TCV-503

Recent goods issues

Posting dateQtyOrderOrder type
07 Jul 20265204000002628Preventive