GASKET,SHEET,2IN,300#,GR/304
Material 4100018144 · GASKET · Plant 1000
ASafety-criticalReduceNon-moving
- Material
- 4100018144
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 0.4 EA/year: 0.4 unplanned (installed-base failure prior (no history)).
- 3.Lead time ~31 days; expected demand during lead time 0.0.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
- 5.Stock 14 exceeds the level to keep (8) by 6.
- 6.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
14 / 0
no open PO
Today Min / Max
10 / 18
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 36.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 4 functional locations
3 with criticality A/B · 7 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LCV-1620 LEVEL CONTROL VALVE | A | 1 | 5 | 2.26 |
| PX_HE-535C FUEL OIL COOLER | A | 1 | 1 | 0.22 |
| PX_HE-819 FUEL OIL CONDENSER | A | 1 | 0 | 0.22 |
| PX_PRV-1401A SAFETY VALVE HE-275C | S | 4 | 0 | 0.04 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 03 Aug 2026 | Medium | PX_LCV-1620 | Repair insulation LCV-1620 |
| 09 Apr 2026 | Medium | PX_LCV-1620 | LCV-1620 passing |
| 19 Dec 2025 | Low | PX_LCV-1620 | LCV-1620; small leak at packing |
| 01 Nov 2025 | Medium | PX_LCV-1620 | LCV-1620 stuck |
| 26 Jun 2025 | Medium | PX_LCV-1620 | Leak from packing |
| 30 May 2025 | Medium | PX_HE-535C | Cleaning HE-535C |
Recent goods issues
Never issued in the 17-month history.