GASKET,SHEET,2IN,300#,GR/304

Material 4100018144 · GASKET · Plant 1000

ASafety-criticalReduceNon-moving
Material
4100018144
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 4 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.4 EA/year: 0.4 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~31 days; expected demand during lead time 0.0.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 5.Stock 14 exceeds the level to keep (8) by 6.
  • 6.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
14 / 0
no open PO
Today Min / Max
10 / 18
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
100.0%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 36.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 4 functional locations

3 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-1620
LEVEL CONTROL VALVE
A152.26
PX_HE-535C
FUEL OIL COOLER
A110.22
PX_HE-819
FUEL OIL CONDENSER
A100.22
PX_PRV-1401A
SAFETY VALVE HE-275C
S400.04

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Aug 2026MediumPX_LCV-1620Repair insulation LCV-1620
09 Apr 2026MediumPX_LCV-1620LCV-1620 passing
19 Dec 2025LowPX_LCV-1620LCV-1620; small leak at packing
01 Nov 2025MediumPX_LCV-1620LCV-1620 stuck
26 Jun 2025MediumPX_LCV-1620Leak from packing
30 May 2025MediumPX_HE-535CCleaning HE-535C

Recent goods issues

Never issued in the 17-month history.