GASKET,SHEET,8IN,150#,GRAPHITE
Material 4100018541 · GASKET · Plant 1000
BReorderCriticalStockout
- Material
- 4100018541
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 2 FuncLocs A/B)
- Supplier
- CAHAYA INDUSTRI SENTOSA PT
- Lead time
- 28 d · P80 26 d
- Unit price
- Rp 394,096
Recommendation
- 1.Forecast 4.5 EA/year: 4.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~28 days; expected demand during lead time 0.3.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 10.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 10 now.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
10 EA
Rp 3.9M · order by 01 Oct 2026
Expected arrival ≈ 28 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
10
order qty 5
Service level
99.7%
stockout risk now 7%
Unit price
Rp 394,096
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 146 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 80.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_VD-1069 PROPYLENE DRUM | B | 1 | 5 | 1.79 |
| PX_LCV-787A LEVEL CONTROL VALVE | C | 1 | 0 | 0.12 |
Lead time and procurement
Lead time 28 ± 9 days (PO history, 3 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 Jul 2026 | PR01 Import / long-lead | 4 | Rp 389,862 | 26 Aug 2026 | 27 d |
| 22 Jun 2026 | PR03 Regular replenishment | 2 | Rp 395,255 | 17 Jul 2026 | 25 d |
| 17 Jun 2025 | PR03 Regular replenishment | 3 | Rp 394,096 | 10 Jul 2025 | 23 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Aug 2026 | Medium | PX_VD-1069 | VD-1069 level glass broken |
| 19 Apr 2026 | Medium | PX_VD-1069 | Replace lamp as per PM finding |
| 15 Dec 2025 | Medium | PX_VD-1069 | Inspect VD-1069 |
| 05 Oct 2025 | Low | PX_VD-1069 | VD-1069 level glass broken |
| 30 May 2025 | Medium | PX_VD-1069 | Inspect VD-1069 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 May 2026 | 5 | 204000032966 | Preventive |
| 19 May 2025 | 4 | 204000017830 | Preventive |