Sparely
DU

GASKET,SHEET,8IN,150#,GRAPHITE

Material 4100018541 · GASKET · Plant 1000

BReorderCriticalStockout
Material
4100018541
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
CAHAYA INDUSTRI SENTOSA PT
Lead time
28 d · P80 26 d
Unit price
Rp 394,096

Recommendation

  • 1.Forecast 4.5 EA/year: 4.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~28 days; expected demand during lead time 0.3.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 10.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 10 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
10 EA
Rp 3.9M · order by 01 Oct 2026
Expected arrival ≈ 28 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
10
order qty 5
Service level
99.7%
stockout risk now 7%
Unit price
Rp 394,096
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 146 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 80.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~15 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_VD-1069
PROPYLENE DRUM
B151.79
PX_LCV-787A
LEVEL CONTROL VALVE
C100.12

Lead time and procurement

Lead time 28 ± 9 days (PO history, 3 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
30 Jul 2026PR01
Import / long-lead
4Rp 389,86226 Aug 202627 d
22 Jun 2026PR03
Regular replenishment
2Rp 395,25517 Jul 202625 d
17 Jun 2025PR03
Regular replenishment
3Rp 394,09610 Jul 202523 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Aug 2026MediumPX_VD-1069VD-1069 level glass broken
19 Apr 2026MediumPX_VD-1069Replace lamp as per PM finding
15 Dec 2025MediumPX_VD-1069Inspect VD-1069
05 Oct 2025LowPX_VD-1069VD-1069 level glass broken
30 May 2025MediumPX_VD-1069Inspect VD-1069

Recent goods issues

Posting dateQtyOrderOrder type
08 May 20265204000032966Preventive
19 May 20254204000017830Preventive
Sparely