GASKET,SW,1/2IN,600#,GR/304

Material 4100018591 · GASKET · Plant 1000

BSafety-criticalReduceNon-moving
Material
4100018591
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 3 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
31 d · P80 51 d
Unit price
Rp 214,454 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality B). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~31 days; expected demand during lead time 0.0.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 4.
  • 5.Stock 10 exceeds the level to keep (4) by 6.
  • 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
10 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
4
order qty 4
Service level
99.9%
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1015
HE-1921D PRESSURE CONTROL
B100.08
UT_HE-536
FLUSHING OIL CONDENSER
C100.22
PX_PRV-343A
SAFETY VALVE HE-1982
S110.04

Lead time and procurement

Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 May 2025HighPX_PRV-343ALeak from packing

Recent goods issues

Never issued in the 17-month history.