GASKET,SW,1IN,300#,GRAPHITE
Material 4100018925 · GASKET · Plant 1000
CReducePotentially obsolete
- Material
- 4100018925
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 31 d · P80 51 d
- Unit price
- Rp 214,454 (est.)
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~31 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 804 exceeds the level to keep (0) by 804.
Convert to Non StockPrice estimatedLead time estimated
On hand / on order
804 / 0
no open PO
Today Min / Max
10 / 25
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 214,454
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 70,998/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~15 days.
Installed on 2 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_2-LS-13224-A21A-H PIPE-2 FROM CL-398 TO PP-1160 | C | 1 | 1 | 0.01 |
| PX_HE-289D FEED EXCHANGER | S | 1 | 0 | 0.22 |
Lead time and procurement
Lead time 31 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 03 May 2025 | Medium | PX_2-LS-13224-A21A-H | Replace pipe 2-LS-13224-A21A-H |
Recent goods issues
Never issued in the 17-month history.