GASKET,SW,6IN,150#,PTFE
Material 4100018944 · GASKET · Plant 1000
CMonitorSlow-moving
- Material
- 4100018944
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 4 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 34 d · P80 51 d
- Unit price
- Rp 654,088
Recommendation
- 1.Forecast 3.5 EA/year: 3.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~34 days; expected demand during lead time 0.3.
- 3.A 97.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 12.
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
12
order qty 12
Service level
97.3%
stockout risk now 3%
Unit price
Rp 654,088
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 291 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~15 days.
Installed on 4 functional locations
0 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-1579D SPENT CAUSTIC PREHEATER | C | 2 | 1 | 0.22 |
| PX_FCV-1797 CONTROL VALVE | C | 1 | 0 | 0.11 |
| PX_ROF-545 RESTRICTION ORIFICE | C | 1 | 0 | 0.00 |
| PX_PCV-538 HE-876B PRESSURE CONTROL | S | 1 | 0 | 0.08 |
Lead time and procurement
Lead time 34 ± 16 days (PO history + category, 1 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 06 Sept 2025 | PR01 Import / long-lead | 2 | Rp 654,088 | 20 Oct 2025 | 44 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 10 May 2025 | Medium | PX_HE-1579D | [MSI-B-25-RCD-299/M] Replace line |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Dec 2025 | 7 | 201000017345 | Corrective |
| 14 Dec 2025 | 5 | 201000032995 | Corrective |