Sparely
DU

GASKET,SW,1IN,600#,GRAPHITE

Material 4100019065 · GASKET · Plant 1000

AReorderNormalSlow-moving
Material
4100019065
Category
GASKET
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
28 d · P80 28 d
Unit price
Rp 103,604

Recommendation

  • 1.Forecast 14 EA/year: 14 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~28 days; expected demand during lead time 1.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 26, order up to 41.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 38 now.
  • 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
  • 6.ML early warning: 33% probability of demand in the next 90 days.
Proposed purchase requisition
38 EA
Rp 3.9M · order by 01 Oct 2026
Expected arrival ≈ 28 days
ML early warningSingle source
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
26
safety stock 25
Rec. Max
41
order qty 15
Service level
100.0%
stockout risk now 8%
Unit price
Rp 103,604
PO history
ML early warning: 33% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 445 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 338.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.

Installed on 3 functional locations

3 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-137A
C4 PRODUCT COMPRESSOR
A121.43
PX_3/4-P-10242-A51A-T
PIPE-3/4 FROM PP-1407B TO BF-104
A100.01
PX_PP-1498C
CHARGE GAS PUMP
B151.90

Lead time and procurement

Lead time 28 ± 12 days (PO history, 3 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
03 Aug 2026PR03
Regular replenishment
4Rp 103,60405 Sept 202633 d
31 Jul 2026PR06
Regular replenishment
3Rp 102,29321 Aug 202621 d
02 Sept 2025PR06
Regular replenishment
2Rp 108,46722 Sept 202520 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Jul 2027PX_PP-1498CPump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Aug 2026LowPX_PP-1498C[MSI-B-26-LAH-309/M] Replace line
22 Jul 2026HighPX_PP-1498CInstall scaffolding at PP-1498C
16 Jun 2026MediumPX_PP-1498COverhaul PP-1498C
28 Apr 2026MediumPX_PP-1498COil leak at PP-1498C bearing housing
28 Feb 2026MediumPX_KC-137AOverhaul
29 Jun 2025MediumPX_PP-1498CReplace bearing PP-1498C
07 Jun 2025LowPX_KC-137ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
13 Jul 202513201000007754Corrective