GASKET,SW,1IN,600#,GRAPHITE
Material 4100019065 · GASKET · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100019065
- Category
- GASKET
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- GEMILANG LOGAM MAKMUR PT
- Lead time
- 28 d · P80 28 d
- Unit price
- Rp 103,604
Recommendation
- 1.Forecast 14 EA/year: 14 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~28 days; expected demand during lead time 1.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 26, order up to 41.
- 4.On hand 3 + on order 0 is at or below the reorder point: order 38 now.
- 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
- 6.ML early warning: 33% probability of demand in the next 90 days.
Proposed purchase requisition
38 EA
Rp 3.9M · order by 01 Oct 2026
Expected arrival ≈ 28 days
ML early warningSingle source
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
26
safety stock 25
Rec. Max
41
order qty 15
Service level
100.0%
stockout risk now 8%
Unit price
Rp 103,604
PO history
ML early warning: 33% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 445 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 338.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~15 days.
Installed on 3 functional locations
3 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-137A C4 PRODUCT COMPRESSOR | A | 1 | 2 | 1.43 |
| PX_3/4-P-10242-A51A-T PIPE-3/4 FROM PP-1407B TO BF-104 | A | 1 | 0 | 0.01 |
| PX_PP-1498C CHARGE GAS PUMP | B | 1 | 5 | 1.90 |
Lead time and procurement
Lead time 28 ± 12 days (PO history, 3 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 03 Aug 2026 | PR03 Regular replenishment | 4 | Rp 103,604 | 05 Sept 2026 | 33 d |
| 31 Jul 2026 | PR06 Regular replenishment | 3 | Rp 102,293 | 21 Aug 2026 | 21 d |
| 02 Sept 2025 | PR06 Regular replenishment | 2 | Rp 108,467 | 22 Sept 2025 | 20 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 02 Jul 2027 | PX_PP-1498C | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Aug 2026 | Low | PX_PP-1498C | [MSI-B-26-LAH-309/M] Replace line |
| 22 Jul 2026 | High | PX_PP-1498C | Install scaffolding at PP-1498C |
| 16 Jun 2026 | Medium | PX_PP-1498C | Overhaul PP-1498C |
| 28 Apr 2026 | Medium | PX_PP-1498C | Oil leak at PP-1498C bearing housing |
| 28 Feb 2026 | Medium | PX_KC-137A | Overhaul |
| 29 Jun 2025 | Medium | PX_PP-1498C | Replace bearing PP-1498C |
| 07 Jun 2025 | Low | PX_KC-137A | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 Jul 2025 | 13 | 201000007754 | Corrective |