GASKET,SHEET,1-1/2IN,150#,PTFE

Material 4100019103 · GASKET · Plant 1000

SReduceSlow-moving
Material
4100019103
Category
GASKET
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
BINTANG MESINDO PRATAMA PT
Lead time
30 d · P80 51 d
Unit price
Rp 47,879

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~30 days; expected demand during lead time 0.0.
  • 3.A 97.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 6 exceeds the level to keep (1) by 5.
Single source
On hand / on order
6 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.9%
stockout risk now 0%
Unit price
Rp 47,879
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 226 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 490,619/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~15 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FCV-1289
BY PASS LINE
S110.11

Lead time and procurement

Lead time 30 ± 16 days (PO history + category, 1 PO lines) · on-time 49%

PR dateTypeQtyUnit priceDeliveryLead time
06 Nov 2025PR06
Regular replenishment
2Rp 47,87904 Dec 202528 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 May 2025LowPX_FCV-1289Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
17 Feb 20261201000005011Corrective