O-RING,NBR,41MM ID,5.3MM CS

Material 4100019326 · O-RING · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100019326
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (71 of 110 FuncLocs A/B, 21 safety/shutdown valve)
Supplier
TIRTA SUPLINDO LESTARI PT
Lead time
20 d · P80 27 d
Unit price
Rp 52,126

Recommendation

  • 1.Safety-critical element: installed on 21 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 393 EA/year: 389 unplanned (recency-weighted compound poisson (own history)) + 3.6 from the maintenance plan.
  • 3.Lead time ~20 days; expected demand during lead time 22.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 71, order up to 408.
  • 5.Installed on 110 FuncLoc(s), 71 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 68Single sourceAbnormal consumptionOpen PO
On hand / on order
62 / 330
next delivery 13 Oct 2026
Today Min / Max
34 / 89
static parameters in BoM
Rec. Min (reorder point)
71
safety stock 50
Rec. Max
408
order qty 337
Service level
99.9%
stockout risk now 0%
Unit price
Rp 52,126
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 34 issue days in the last 180 days, last issue 1 days ago, 64 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 17 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (114 units) excluded from the baseline.

Demand pattern Smooth · 136 issue days · 2 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 25.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 110 functional locations

71 with criticality A/B · 146 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_KC-419A
PROPYLENE FAN
A1195.71
PX_KC-536A
LUBE OIL BLOWER
A1114.42
PX_PP-1776B
RICH AMINE PUMP
A183.62
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_PP-790A
CHARGE GAS PUMP
A172.76
PX_KC-226
HYDROGEN AIR COMPRESSOR
A162.28
PX_KC-308B
REFLUX BLOWER
A162.28
PX_KC-732D
METHANOL COMPRESSOR
A163.14
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_PP-1970
FEED PUMP
A161.47
PX_KC-222B
LEAN AMINE COMPRESSOR
A151.85
PX_KC-316D
METHANOL FAN
A151.43

Lead time and procurement

Lead time 20 ± 9 days (PO history, 45 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
14 Sept 2026PR03
Regular replenishment
330Rp 50,55813 Oct 2026
open
29 d
31 Aug 2026PR03
Regular replenishment
207Rp 51,52117 Sept 202617 d
22 Aug 2026PR03
Regular replenishment
263Rp 53,16107 Sept 202616 d
20 Aug 2026PR06
Regular replenishment
208Rp 50,84130 Aug 202610 d
10 Aug 2026PR03
Regular replenishment
378Rp 50,99125 Sept 202646 d
08 Aug 2026PR05
Project / turnaround
320Rp 52,90930 Aug 202622 d
10 Jul 2026PR04
Regular (other)
259Rp 53,12730 Jul 202620 d
30 Jun 2026PR06
Regular replenishment
134Rp 50,05111 Jul 202611 d
16 Jun 2026PR03
Regular replenishment
124Rp 51,99130 Jun 202614 d
06 Jun 2026PR06
Regular replenishment
169Rp 54,46230 Jun 202624 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72
02 Feb 2027PX_PP-376APump overhaul0.72
02 Jun 2027PX_PP-1970Pump overhaul0.72
01 Aug 2027PX_KC-620ACompressor major overhaul0.72
02 Aug 2027PX_PP-536Pump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Sept 2026LowPX_KC-886DKC-886D high vibration
28 Sept 2026HighPY_KC-419AOverhaul
26 Sept 2026MediumPX_KC-396Replace lamp as per PM finding
26 Sept 2026EmergencyPX_KC-773AInspect coupling KC-773A
24 Sept 2026EmergencyPX_KC-538KC-538 high vibration
24 Sept 2026EmergencyPX_PP-410Install cover plate for MCP cracking
23 Sept 2026MediumPX_KC-513KC-513 high vibration
23 Sept 2026MediumPX_PP-790APP-790A abnormal noise
23 Sept 2026MediumPY_KC-419AInspect coupling KC-419A
22 Sept 2026HighPX_KC-536AOverhaul

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20268201000012524Corrective
23 Sept 20262209000029477Other maintenance
10 Sept 20266201000015119Corrective
10 Sept 20264201000021470Corrective
10 Sept 20261204000008119Preventive
26 Aug 20261201000038696Corrective
05 Aug 20263204000027988Preventive
02 Aug 20261201000026506Corrective
23 Jul 20262201000024568Corrective
17 Jul 20261201000011960Corrective
16 Jul 20269201000011801Corrective
15 Jul 20265201000020061Corrective
10 Jul 20261201000002156Corrective
08 Jul 20266201000029459Corrective
05 Jul 20266201000037602Corrective