Sparely
DU

O-RING,NBR,139MM ID,2.5MM CS

Material 4100019363 · O-RING · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100019363
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (27 of 49 FuncLocs A/B, 7 safety/shutdown valve)
Supplier
TIRTA SUPLINDO LESTARI PT
Lead time
28 d · P80 38 d
Unit price
Rp 160,162

Recommendation

  • 1.Safety-critical element: installed on 7 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 272 EA/year: 268 unplanned (recency-weighted compound poisson (own history)) + 4.3 from the maintenance plan.
  • 3.Lead time ~28 days; expected demand during lead time 21.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 74, order up to 234.
  • 5.Installed on 49 FuncLoc(s), 27 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 32Single sourceAbnormal consumptionOpen PO
On hand / on order
35 / 154
next delivery 20 Oct 2026
Today Min / Max
23 / 51
static parameters in BoM
Rec. Min (reorder point)
74
safety stock 54
Rec. Max
234
order qty 160
Service level
99.9%
stockout risk now 0%
Unit price
Rp 160,162
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 24 issue days in the last 180 days, last issue 1 days ago, 42 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 8 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (42 units) excluded from the baseline.

Demand pattern Smooth · 79 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 15.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 49 functional locations

27 with criticality A/B · 60 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1729A
COOLING WATER PUMP
A1217.90
PX_KC-717
FLUSHING OIL COMPRESSOR
A194.00
PX_PP-103
COOLING WATER PUMP
A172.33
PX_KC-452
HYDROGEN FAN
A162.71
PX_KC-713B
SPENT CAUSTIC FAN
A163.14
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KC-222B
LEAN AMINE COMPRESSOR
A151.85
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KC-447
LUBE OIL COMPRESSOR
A141.85
PX_KC-106B
GASOLINE BLOWER
A421.00
PX_KC-801
DEMIN WATER FAN
A121.43
PX_KT-460B
TURBINE FOR KC-460B
A121.96

Lead time and procurement

Lead time 28 ± 16 days (PO history, 16 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
23 Aug 2026PR03
Regular replenishment
154Rp 160,83920 Oct 2026
open
58 d
16 Jul 2026PR03
Regular replenishment
82Rp 161,84625 Aug 202640 d
19 Jun 2026PR06
Regular replenishment
122Rp 159,48529 Jun 202610 d
16 Jun 2026PR06
Regular replenishment
80Rp 158,38424 Jul 202638 d
15 Jun 2026PR03
Regular replenishment
197Rp 159,06915 Jul 202630 d
29 May 2026PR06
Regular replenishment
82Rp 158,54906 Jul 202638 d
04 May 2026PR03
Regular replenishment
82Rp 163,39701 Jun 202628 d
06 Apr 2026PR03
Regular replenishment
205Rp 159,37707 Jun 202662 d
25 Mar 2026PR03
Regular replenishment
59Rp 164,48313 Apr 202619 d
18 Mar 2026PR05
Project / turnaround
136Rp 163,82007 Apr 202620 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Mar 2027PX_PP-807BPump overhaul0.72
01 May 2027PX_SDV-1417Final Element Overhaul; ONOFFV0.72
07 Jul 2027PX_KC-505DCompressor major overhaul2.86

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Sept 2026LowPX_PP-103Oil leak at PP-103 bearing housing
27 Sept 2026MediumPX_PP-1729AInstall scaffolding at PP-1729A
27 Sept 2026MediumPX_PP-807BReplace bearing PP-807B
26 Sept 2026MediumPX_KC-365CKC-365C lube oil filter DP high
24 Sept 2026EmergencyPX_KC-538KC-538 high vibration
24 Sept 2026MediumPX_PP-103PP-103 abnormal noise
24 Sept 2026EmergencyPX_PP-410Install cover plate for MCP cracking
21 Sept 2026LowPX_KC-717Leak from packing
21 Sept 2026MediumPX_KC-843Painting KC-843
20 Sept 2026LowPX_PP-1729A[MSI-B-26-TCT-349] Permanent repair

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20267201000024363Corrective
22 Sept 202610209000029477Other maintenance
19 Sept 20261201000026093Corrective
14 Sept 20265201000018595Corrective
25 Aug 20265201000037723Corrective
25 Aug 20261201000038696Corrective
24 Aug 20261201000037723Corrective
20 Aug 20261201000008952Corrective
15 Aug 20265201000011746Corrective
10 Aug 20261204000013772Preventive
21 Jul 20265205000018883Other maintenance
19 Jul 20264201000028005Corrective
13 Jul 20264201000021933Corrective
10 Jul 20264201000026179Corrective
07 Jul 202610201000028383Corrective