O-RING,VITON,24MM ID,5.3MM CS

Material 4100019372 · O-RING · Plant 1000

ASafety-criticalMonitorHealthy
Material
4100019372
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (20 of 31 FuncLocs A/B, 4 safety/shutdown valve)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
31 d · P80 40 d
Unit price
Rp 20,269

Recommendation

  • 1.Safety-critical element: installed on 4 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 177 EA/year: 176 unplanned (recency-weighted compound poisson (own history)) + 1.4 from the maintenance plan.
  • 3.Lead time ~31 days; expected demand during lead time 15.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 55, order up to 233.
  • 5.Installed on 31 FuncLoc(s), 20 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 48Single sourceAbnormal consumptionOpen PO
On hand / on order
180 / 172
next delivery 04 Oct 2026
Today Min / Max
47 / 146
static parameters in BoM
Rec. Min (reorder point)
55
safety stock 41
Rec. Max
233
order qty 178
Service level
99.9%
stockout risk now 0%
Unit price
Rp 20,269
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 19 issue days in the last 180 days, last issue 1 days ago, 15 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 8 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (92 units) excluded from the baseline.

Demand pattern Erratic · 65 issue days · 3 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 13.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 31 functional locations

20 with criticality A/B · 37 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_KC-419A
PROPYLENE FAN
A1195.71
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KC-222B
LEAN AMINE COMPRESSOR
A151.85
PX_PP-139
CAUSTIC PUMP
A441.90
PX_KC-778A
CONDENSATE COMPRESSOR
A131.43
PX_PP-207
INHIBITOR PUMP
A131.47
PX_KC-235D
DEMIN WATER FAN
A121.00
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_PP-1125B
HYDROGEN PUMP
A120.62
PX_PP-779A
LUBE OIL PUMP
A120.62
PX_KC-397A
DILUTION STEAM FAN
A110.57

Lead time and procurement

Lead time 31 ± 17 days (PO history, 28 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
20 Sept 2026PR03
Regular replenishment
172Rp 21,19104 Oct 2026
open
14 d
27 Jul 2026PR06
Regular replenishment
169Rp 20,98112 Sept 202647 d
08 Jun 2026PR03
Regular replenishment
113Rp 19,88730 Jun 202622 d
05 Jun 2026PR03
Regular replenishment
171Rp 19,73220 Jun 202615 d
11 May 2026PR03
Regular replenishment
117Rp 19,51031 May 202620 d
08 May 2026PR03
Regular replenishment
185Rp 20,96118 Aug 2026102 d
02 May 2026PR03
Regular replenishment
125Rp 20,46112 Jun 202641 d
15 Apr 2026PR03
Regular replenishment
184Rp 20,74904 May 202619 d
29 Mar 2026PR03
Regular replenishment
147Rp 19,96215 Apr 202617 d
05 Feb 2026PR04
Regular (other)
120Rp 20,63128 Feb 202623 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_KC-235DCompressor major overhaul0.72
26 Dec 2026PX_KT-264ATurbine major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_PP-1892BReplace lamp as per PM finding
28 Sept 2026HighPY_KC-419AOverhaul
23 Sept 2026MediumPX_PP-1892BPP-1892B abnormal noise
23 Sept 2026MediumPY_KC-419AInspect coupling KC-419A
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
18 Sept 2026MediumPY_KC-419AInstall scaffolding at KC-419A
01 Sept 2026HighPX_KC-582BKC-582B high vibration
31 Aug 2026MediumPY_KC-419AInstall cover plate for MCP cracking
28 Aug 2026MediumPY_KC-419AInstall scaffolding at KC-419A
26 Aug 2026LowPX_KC-582BPainting KC-582B

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20261201000000813Corrective
13 Sept 202612201000022973Corrective
28 Aug 20263201000028982Corrective
14 Aug 20265201000011746Corrective
29 Jul 20263201000005074Corrective
29 Jul 202612203000004330Turnaround
28 Jul 20264201000037932Corrective
26 Jul 20264203000004330Turnaround
25 Jul 20262203000004330Turnaround
22 Jul 20262201000023160Corrective
18 Jul 20263201000015470Corrective
13 Jul 20264201000013975Corrective
06 Jul 20261201000029242Corrective
05 Jul 20263204000019293Preventive
19 Jun 20262201000039950Corrective