O-RING,VITON,263MM ID,2.5MM CS
Material 4100019402 · O-RING · Plant 1000
ASafety-criticalMonitorHealthy
- Material
- 4100019402
- Category
- O-RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (13 of 20 FuncLocs A/B, 3 safety/shutdown valve)
- Supplier
- MEGA UTAMA GLOBAL PT
- Lead time
- 42 d · P80 69 d
- Unit price
- Rp 73,747
Recommendation
- 1.Safety-critical element: installed on 3 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 92 EA/year: 90 unplanned (recency-weighted compound poisson (own history)) + 1.4 from the maintenance plan.
- 3.Lead time ~42 days; expected demand during lead time 10.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 41, order up to 133.
- 5.Installed on 20 FuncLoc(s), 13 of them criticality A/B.
- 6.ML early warning: 100% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningLast turnaround used 46Single sourceAbnormal consumption
On hand / on order
48 / 0
no open PO
Today Min / Max
18 / 53
static parameters in BoM
Rec. Min (reorder point)
41
safety stock 31
Rec. Max
133
order qty 92
Service level
99.9%
stockout risk now 0%
Unit price
Rp 73,747
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 12 issue days in the last 180 days, last issue 1 days ago, 16 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 9 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (46 units) excluded from the baseline.
Demand pattern Erratic · 40 issue days · 5 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 8.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 20 functional locations
13 with criticality A/B · 20 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-247A SLOP OIL FAN | A | 1 | 9 | 4.00 |
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PX_PP-818 LUBE OIL PUMP | A | 1 | 6 | 1.90 |
| PX_KC-317B RICH AMINE FAN | A | 1 | 4 | 1.85 |
| PX_KC-396 WASH WATER BLOWER | A | 1 | 3 | 1.43 |
| PX_PP-1769A LUBE OIL PUMP | A | 1 | 3 | 0.19 |
| PX_PP-417 GASOLINE PUMP | A | 1 | 3 | 0.62 |
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_KT-513 TURBINE FOR KC-513 | A | 1 | 2 | 1.53 |
| PX_PP-1599A SLOP OIL PUMP | B | 1 | 5 | 1.90 |
| PX_PP-1397 METHANOL PUMP | B | 1 | 4 | 1.05 |
| PX_SDV-459B HE-132D SHUTDOWN VALVE | B | 1 | 3 | 0.91 |
Lead time and procurement
Lead time 42 ± 26 days (PO history, 16 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 28 Aug 2026 | PR06 Regular replenishment | 73 | Rp 76,787 | 16 Sept 2026 | 19 d |
| 12 Aug 2026 | PR06 Regular replenishment | 77 | Rp 75,235 | 04 Sept 2026 | 23 d |
| 23 Jul 2026 | PR03 Regular replenishment | 65 | Rp 76,927 | 16 Sept 2026 | 55 d |
| 14 Jul 2026 | PR03 Regular replenishment | 94 | Rp 72,403 | 08 Sept 2026 | 56 d |
| 30 Jun 2026 | PR06 Regular replenishment | 84 | Rp 72,516 | 14 Jul 2026 | 14 d |
| 23 May 2026 | PR03 Regular replenishment | 75 | Rp 77,040 | 04 Jun 2026 | 12 d |
| 18 May 2026 | PR03 Regular replenishment | 86 | Rp 74,417 | 15 Jun 2026 | 28 d |
| 14 May 2026 | PR03 Regular replenishment | 57 | Rp 72,364 | 22 Jul 2026 | 69 d |
| 24 Apr 2026 | PR03 Regular replenishment | 90 | Rp 75,780 | 11 Jul 2026 | 78 d |
| 28 Mar 2026 | PR03 Regular replenishment | 48 | Rp 73,621 | 29 Apr 2026 | 32 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 0.72 |
| 13 Aug 2027 | PX_PP-1397 | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Medium | PX_KC-396 | Replace lamp as per PM finding |
| 19 Sept 2026 | High | PX_KT-383A | [MSI-B-26-CWK-358] Permanent repair |
| 18 Sept 2026 | Medium | PX_KT-202 | Repair insulation KT-202 |
| 16 Sept 2026 | Medium | PX_KT-383A | Install scaffolding at KT-383A |
| 05 Sept 2026 | Medium | PX_PP-1599A | PP-1599A abnormal noise |
| 02 Sept 2026 | Low | PX_KT-383A | Replace lamp as per PM finding |
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 27 Aug 2026 | High | PX_KC-247A | Inspect coupling KC-247A |
| 23 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 20 Aug 2026 | Low | PX_PP-1397 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 5 | 201000025027 | Corrective |
| 26 Sept 2026 | 6 | 201000005010 | Corrective |
| 21 Sept 2026 | 2 | 201000022167 | Corrective |
| 20 Sept 2026 | 2 | 201000023715 | Corrective |
| 11 Sept 2026 | 2 | 201000028460 | Corrective |
| 02 Sept 2026 | 1 | 201000014482 | Corrective |
| 03 Aug 2026 | 7 | 201000010583 | Corrective |
| 15 Jul 2026 | 2 | 201000025691 | Corrective |
| 25 Jun 2026 | 12 | 201000034485 | Corrective |
| 18 Jun 2026 | 6 | 201000017478 | Corrective |
| 11 Jun 2026 | 1 | 201000023717 | Corrective |
| 08 May 2026 | 1 | 204000032966 | Preventive |
| 13 Mar 2026 | 9 | 201000015104 | Corrective |
| 18 Feb 2026 | 2 | 201000003328 | Corrective |
| 12 Feb 2026 | 2 | 201000032040 | Corrective |