O-RING,VITON,151MM ID,2.5MM CS

Material 4100019425 · O-RING · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100019425
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (18 of 23 FuncLocs A/B, 5 safety/shutdown valve)
Supplier
ANUGRAH INSTRUMEN SENTOSA PT
Lead time
44 d · P80 60 d
Unit price
Rp 86,067

Recommendation

  • 1.Safety-critical element: installed on 5 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 77 EA/year: 77 unplanned (recency-weighted compound poisson (own history)) + 0.7 from the maintenance plan.
  • 3.Lead time ~44 days; expected demand during lead time 9.3.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 31, order up to 109.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 109 now.
  • 6.Installed on 23 FuncLoc(s), 18 of them criticality A/B.
  • 7.ML early warning: 99% probability of demand in the next 90 days.
Proposed purchase requisition
109 EA
Rp 9.4M · order by 01 Oct 2026
Expected arrival ≈ 44 days
Safety-critical (SCE)ML early warningLast turnaround used 54Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
57 / 97
static parameters in BoM
Rec. Min (reorder point)
31
safety stock 22
Rec. Max
109
order qty 78
Service level
99.9%
stockout risk now 93%
Unit price
Rp 86,067
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 7 issue days in the last 180 days, last issue 44 days ago, 7 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 7 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (78 units) excluded from the baseline.

Demand pattern Erratic · 36 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 23 functional locations

18 with criticality A/B · 23 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KC-226
HYDROGEN AIR COMPRESSOR
A162.28
PX_KC-713B
SPENT CAUSTIC FAN
A163.14
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_PP-1735
SPENT CAUSTIC PUMP
A141.47
PX_KC-671D
FEED BLOWER
A131.00
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_SDV-709
VD-840 SHUTDOWN VALVE
A120.91
PX_KC-663A
CONDENSATE FAN
A110.57
PX_KC-527
METHANOL BLOWER
A100.57
PX_PP-640A
SPENT CAUSTIC PUMP
A100.19

Lead time and procurement

Lead time 44 ± 21 days (PO history, 16 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
18 Aug 2026PR03
Regular replenishment
99Rp 90,08113 Sept 202626 d
01 Jul 2026PR03
Regular replenishment
73Rp 86,69225 Aug 202655 d
25 Jun 2026PR03
Regular replenishment
54Rp 86,37517 Sept 202684 d
06 Jun 2026PR03
Regular replenishment
51Rp 89,14304 Aug 202659 d
11 May 2026PR03
Regular replenishment
77Rp 88,51012 Jun 202632 d
02 May 2026PR06
Regular replenishment
86Rp 86,03311 Jun 202640 d
06 Apr 2026PR05
Project / turnaround
99Rp 85,61728 Jun 202683 d
18 Mar 2026PR03
Regular replenishment
77Rp 84,56507 May 202650 d
03 Mar 2026PR03
Regular replenishment
33Rp 84,35424 Mar 202621 d
08 Dec 2025PR06
Regular replenishment
45Rp 83,05306 Feb 202660 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026LowPX_PP-715ALeak from packing
03 Sept 2026LowPX_KC-226KC-226 bearing temp high
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
21 Aug 2026LowPX_KC-226KC-226 high vibration
03 Aug 2026MediumPX_KC-671DKC-671D bearing temp high
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
17 Jun 2026LowPX_KC-713BLeak from packing
12 Jun 2026HighPX_KC-713BInspect coupling KC-713B
11 Jun 2026LowPX_KT-264ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
18 Aug 20261201000006432Corrective
12 Jul 20262209000016630Other maintenance
06 Jul 20261201000013211Corrective
20 Jun 20266209000014083Other maintenance
13 Jun 20264201000023717Corrective
30 May 20264201000020779Corrective
22 Apr 20262201000020310Corrective
03 Apr 20263201000017471Corrective
02 Apr 20261201000005312Corrective
04 Mar 20261201000010251Corrective
22 Feb 20262201000005996Corrective
04 Feb 20264201000004512Corrective
04 Feb 20267201000018202Corrective
30 Jan 202628203000033471Turnaround
29 Jan 20264201000013677Corrective