O-RING,VITON,190MM ID,5.3MM CS

Material 4100019555 · O-RING · Plant 1000

ASafety-criticalReorderNormalBelow reorder point
Material
4100019555
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (9 of 12 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
42 d · P80 49 d
Unit price
Rp 12,064

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 31 EA/year: 31 unplanned (recency-weighted compound poisson (own history)).
  • 3.Lead time ~42 days; expected demand during lead time 3.5.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 21, order up to 52.
  • 5.On hand 11 + on order 7 is at or below the reorder point: order 34 now.
  • 6.Installed on 12 FuncLoc(s), 9 of them criticality A/B.
  • 7.ML early warning: 85% probability of demand in the next 90 days.
Proposed purchase requisition
34 EA
Rp 410,176 · order by 01 Oct 2026
Expected arrival ≈ 42 days
Safety-critical (SCE)ML early warningLast turnaround used 6Single sourceOpen PO
On hand / on order
11 / 7
next delivery 05 Oct 2026
Today Min / Max
7 / 10
static parameters in BoM
Rec. Min (reorder point)
21
safety stock 18
Rec. Max
52
order qty 31
Service level
100.0%
stockout risk now 0%
Unit price
Rp 12,064
PO history
ML early warning: 85% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 34 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (6 units) excluded from the baseline.

Demand pattern Lumpy · 12 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 12 functional locations

9 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-536A
LUBE OIL BLOWER
A1114.42
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PY_KC-636C
SLOP OIL COMPRESSOR
A110.57
PX_PP-1383
PROPYLENE PUMP
A100.19
PX_PP-739
ETHYLENE PUMP
A100.19
PX_SDV-958
CL-1833 SHUTDOWN VALVE
A100.06
PX_PP-1399
LUBE OIL PUMP
B141.47
PX_PP-724
METHANE PUMP
B100.19
PX_SDV-398A
SLOP OIL ISOLATION
S120.91
PX_KC-486
CONDENSATE AIR COMPRESSOR
S100.57
PX_KT-875
TURBINE FOR KC-875
S101.10

Lead time and procurement

Lead time 42 ± 29 days (PO history, 10 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
24 Jun 2026PR06
Regular replenishment
26Rp 12,08906 Jul 202612 d
26 May 2026PR06
Regular replenishment
7Rp 12,03905 Oct 2026
open
132 d
01 May 2026PR03
Regular replenishment
17Rp 11,58105 Jun 202635 d
31 Mar 2026PR03
Regular replenishment
16Rp 12,62825 May 202655 d
22 Mar 2026PR06
Regular replenishment
24Rp 12,48127 Apr 202636 d
18 Mar 2026PR03
Regular replenishment
16Rp 11,97215 Apr 202628 d
09 Feb 2026PR03
Regular replenishment
15Rp 11,82917 Mar 202636 d
27 Nov 2025PR03
Regular replenishment
26Rp 12,59812 Jan 202646 d
24 Aug 2025PR03
Regular replenishment
18Rp 12,29621 Sept 202528 d
11 Jul 2025PR06
Regular replenishment
17Rp 11,60827 Aug 202547 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026HighPX_KC-536AOverhaul
30 Aug 2026MediumPX_PP-1399Install scaffolding at PP-1399
08 Aug 2026HighPX_KC-536AKC-536A bearing temp high
24 Jul 2026HighPX_KC-536AInstall scaffolding at KC-536A
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
05 Jul 2026MediumPX_KC-536ALeak from packing
26 Jun 2026MediumPX_SDV-398ASDV-398A fail to close
24 Jun 2026MediumPX_KC-536AKC-536A bearing temp high
09 Jun 2026HighPX_PP-1399Replace bearing PP-1399
18 Apr 2026MediumPX_PP-1399Repair insulation PP-1399

Recent goods issues

Posting dateQtyOrderOrder type
28 Aug 20265201000007926Corrective
13 Jun 20264209000014321Other maintenance
09 May 20267201000024899Corrective
08 Jan 20264203000006950Turnaround
03 Jan 20261201000014604Corrective
21 Dec 20256201000016287Corrective
20 Dec 20252201000021150Corrective
12 Dec 20259201000000773Corrective
08 Dec 20251201000028486Corrective
20 Nov 20252203000038363Turnaround
19 Nov 20251204000013871Preventive
18 Sept 20258201000039916Corrective
05 Jul 20254201000030028Corrective
30 Jun 20252209000008119Other maintenance