O-RING,VITON,252MM ID,5.3MM CS
Material 4100019559 · O-RING · Plant 1000
ASafety-criticalLong-leadMaintainHealthy
- Material
- 4100019559
- Category
- O-RING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (7 of 11 FuncLocs A/B, 2 safety/shutdown valve)
- Supplier
- DUTA ENERGI ABADI PT
- Lead time
- 65 d · P80 107 d
- Unit price
- Rp 12,930
Recommendation
- 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 46 EA/year: 45 unplanned (recency-weighted compound poisson (own history)) + 1.4 from the maintenance plan.
- 3.Lead time ~65 days; expected demand during lead time 7.9.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 29, order up to 76.
- 5.Long lead time: 80% of deliveries took up to 107 days and the fastest seen in its category 14 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 11 FuncLoc(s), 7 of them criticality A/B.
- 7.ML early warning: 97% probability of demand in the next 90 days.
Safety-critical (SCE)Long-leadML early warningLast turnaround used 16Single sourceOpen PO
On hand / on order
59 / 34
next delivery 13 Oct 2026
Today Min / Max
16 / 43
static parameters in BoM
Rec. Min (reorder point)
29
safety stock 22
Rec. Max
76
order qty 47
Service level
99.9%
stockout risk now 0%
Unit price
Rp 12,930
PO history
ML early warning: 97% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 8 issue days in the last 180 days, last issue 5 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 5 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (16 units) excluded from the baseline.
Demand pattern Lumpy · 17 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.
Installed on 11 functional locations
7 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1530 PROPYLENE PUMP | A | 1 | 4 | 1.47 |
| PX_KC-396 WASH WATER BLOWER | A | 1 | 3 | 1.43 |
| PX_SDV-889 ETHYLENE ISOLATION | A | 1 | 0 | 0.06 |
| PX_PP-339A METHANE PUMP | B | 1 | 6 | 2.33 |
| PX_PP-1498C CHARGE GAS PUMP | B | 1 | 5 | 1.90 |
| PX_PP-483B LEAN AMINE PUMP | B | 1 | 5 | 1.90 |
| PX_PP-490A REFLUX PUMP | B | 1 | 1 | 0.19 |
| PX_PP-1141D DILUTION STEAM PUMP | C | 1 | 0 | 0.19 |
| PX_KC-879A CONDENSATE FAN | S | 1 | 6 | 2.71 |
| PX_PP-148A REFLUX PUMP | S | 1 | 2 | 0.62 |
| PX_SDV-336B RICH AMINE ISOLATION | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 65 ± 32 days (PO history, 13 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 25 Aug 2026 | PR06 Regular replenishment | 16 | Rp 13,127 | 28 Oct 2026 open | 64 d |
| 07 Aug 2026 | PR03 Regular replenishment | 18 | Rp 13,574 | 13 Oct 2026 open | 67 d |
| 25 Jul 2026 | PR03 Regular replenishment | 29 | Rp 12,773 | 05 Sept 2026 | 42 d |
| 26 Jun 2026 | PR03 Regular replenishment | 25 | Rp 12,814 | 04 Aug 2026 | 39 d |
| 04 Apr 2026 | PR03 Regular replenishment | 24 | Rp 13,246 | 22 Jul 2026 | 109 d |
| 29 Mar 2026 | PR04 Regular (other) | 35 | Rp 12,720 | 10 Jul 2026 | 103 d |
| 18 Mar 2026 | PR03 Regular replenishment | 13 | Rp 12,864 | 29 Apr 2026 | 42 d |
| 05 Feb 2026 | PR03 Regular replenishment | 31 | Rp 13,225 | 28 Mar 2026 | 51 d |
| 03 Jan 2026 | PR03 Regular replenishment | 19 | Rp 12,852 | 18 Feb 2026 | 46 d |
| 18 Dec 2025 | PR03 Regular replenishment | 30 | Rp 12,923 | 06 Feb 2026 | 50 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 02 Mar 2027 | PX_PP-339A | Pump overhaul | 0.72 |
| 02 Jul 2027 | PX_PP-1498C | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Medium | PX_KC-396 | Replace lamp as per PM finding |
| 24 Sept 2026 | Low | PX_KC-879A | Inspect coupling KC-879A |
| 07 Sept 2026 | Medium | PX_KC-879A | Replace lamp as per PM finding |
| 25 Aug 2026 | Low | PX_PP-1498C | [MSI-B-26-LAH-309/M] Replace line |
| 19 Aug 2026 | Medium | PX_PP-483B | PP-483B abnormal noise |
| 22 Jul 2026 | High | PX_PP-1498C | Install scaffolding at PP-1498C |
| 19 Jul 2026 | Low | PX_PP-339A | PP-339A seal leak |
| 12 Jul 2026 | Medium | PX_PP-1530 | Replace bearing PP-1530 |
| 29 Jun 2026 | Medium | PX_PP-483B | Oil leak at PP-483B bearing housing |
| 16 Jun 2026 | Medium | PX_PP-1498C | Overhaul PP-1498C |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Sept 2026 | 2 | 201000025207 | Corrective |
| 03 Sept 2026 | 1 | 201000031484 | Corrective |
| 12 Aug 2026 | 1 | 201000022527 | Corrective |
| 09 Jul 2026 | 5 | 201000023095 | Corrective |
| 07 Jun 2026 | 2 | 201000004959 | Corrective |
| 25 Apr 2026 | 1 | 204000012220 | Preventive |
| 23 Apr 2026 | 4 | 201000024864 | Corrective |
| 16 Apr 2026 | 2 | 201000026573 | Corrective |
| 20 Mar 2026 | 2 | 201000009227 | Corrective |
| 17 Feb 2026 | 5 | 201000002211 | Corrective |
| 22 Dec 2025 | 6 | 201000006328 | Corrective |
| 19 Dec 2025 | 10 | 203000033370 | Turnaround |
| 18 Dec 2025 | 4 | 203000014056 | Turnaround |
| 13 Dec 2025 | 5 | 201000000570 | Corrective |
| 02 Dec 2025 | 4 | 201000039183 | Corrective |