O-RING,EPDM,286MM ID,2.5MM CS

Material 4100019638 · O-RING · Plant 1000

AReorderNormalBelow reorder point
Material
4100019638
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 4 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
31 d · P80 40 d
Unit price
Rp 39,684

Recommendation

  • 1.Forecast 11 EA/year: 8.5 unplanned (credibility blend: own history + installed-base prior) + 2.9 from the maintenance plan.
  • 2.Lead time ~31 days; expected demand during lead time 0.7.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 20.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 19 now.
  • 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
  • 6.ML early warning: 33% probability of demand in the next 90 days.
Proposed purchase requisition
19 EA
Rp 753,996 · order by 01 Oct 2026
Expected arrival ≈ 31 days
ML early warningSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 8
Rec. Max
20
order qty 12
Service level
100.0%
stockout risk now 24%
Unit price
Rp 39,684
PO history
ML early warning: 33% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 77 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (6 units) excluded from the baseline.

Demand pattern Lumpy · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 975.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 4 functional locations

1 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_PP-536
HYDROGEN PUMP
C400.19
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_KT-624A
TURBINE FOR KC-624A
S132.39

Lead time and procurement

Lead time 31 ± 13 days (PO history, 4 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
03 May 2026PR06
Regular replenishment
7Rp 38,39217 Jun 202645 d
21 Feb 2026PR03
Regular replenishment
7Rp 39,88330 Mar 202637 d
01 Feb 2026PR03
Regular replenishment
2Rp 39,48501 Mar 202628 d
09 Nov 2025PR06
Regular replenishment
8Rp 40,51230 Nov 202521 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Aug 2027PX_PP-536Pump overhaul2.86

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
24 May 2026HighPX_KT-383AKT-383A steam leak at gland
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
07 Feb 2026MediumPX_KT-624AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
24 Jul 20264203000004330Turnaround
16 Jul 20262201000025691Corrective
12 Jan 20265201000016153Corrective
11 Jan 20263201000031194Corrective
29 Aug 20252201000002071Corrective
27 Jun 20252203000034428Turnaround
30 May 20251201000012935Corrective