Sparely
DU

O-RING,VITON,184MM ID,5.3MM CS

Material 4100019660 · O-RING · Plant 1000

AReorderNormalBelow reorder point
Material
4100019660
Category
O-RING
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 8 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
31 d · P80 40 d
Unit price
Rp 91,984

Recommendation

  • 1.Forecast 15 EA/year: 14 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~31 days; expected demand during lead time 1.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 13, order up to 28.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 26 now.
  • 5.Installed on 8 FuncLoc(s), 5 of them criticality A/B.
  • 6.ML early warning: 38% probability of demand in the next 90 days.
Proposed purchase requisition
26 EA
Rp 2.4M · order by 01 Oct 2026
Expected arrival ≈ 31 days
ML early warningLast turnaround used 4Single sourceAbnormal consumption
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
13
safety stock 12
Rec. Max
28
order qty 15
Service level
100.0%
stockout risk now 25%
Unit price
Rp 91,984
PO history
ML early warning: 38% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 61 days ago, 3 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (4 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · 1 abnormal issue(s) capped · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~14 days.

Installed on 8 functional locations

5 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KC-778A
CONDENSATE COMPRESSOR
A131.43
PY_KC-636C
SLOP OIL COMPRESSOR
A110.57
PX_PP-287D
HYDROGEN PUMP
B231.05
PX_PP-1158B
FUEL OIL PUMP
B300.19
PX_PP-960
REFLUX PUMP
C100.19
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_KT-264A
TURBINE FOR KC-264A
S142.39

Lead time and procurement

Lead time 31 ± 15 days (PO history, 3 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
17 May 2026PR03
Regular replenishment
4Rp 87,96127 Jun 202641 d
30 Jun 2025PR06
Regular replenishment
9Rp 93,15107 Aug 202538 d
27 May 2025PR03
Regular replenishment
4Rp 91,98415 Jun 202519 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_PP-287DPP-287D seal leak
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
12 Jun 2026MediumPX_PP-287DPP-287D seal leak
11 Jun 2026LowPX_KT-264ALeak from packing
04 Jun 2026HighPX_KC-778AInspect coupling KC-778A
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting

Recent goods issues

Posting dateQtyOrderOrder type
01 Aug 20266201000004020Corrective
01 Aug 20263201000026506Corrective
29 Nov 20254203000020446Turnaround
13 Nov 20252201000022786Corrective
23 Oct 20253201000018388Corrective
24 Aug 20254201000033719Corrective
17 Jul 20253201000034773Corrective